Jove
Visualize
Contact Us
JoVE
x logofacebook logolinkedin logoyoutube logo
ABOUT JoVE
OverviewLeadershipBlogJoVE Help Center
AUTHORS
Publishing ProcessEditorial BoardScope & PoliciesPeer ReviewFAQSubmit
LIBRARIANS
TestimonialsSubscriptionsAccessResourcesLibrary Advisory BoardFAQ
RESEARCH
JoVE JournalMethods CollectionsJoVE Encyclopedia of ExperimentsArchive
EDUCATION
JoVE CoreJoVE BusinessJoVE Science EducationJoVE Lab ManualFaculty Resource CenterFaculty Site
Terms & Conditions of Use
Privacy Policy
Policies

Related Experiment Videos

Technical note: preventive maintenance quality assurance.

D Russell1

  • 1Roxborough Memorial Hospital, Philadelphia, PA.

Journal of Clinical Engineering
|July 1, 1992
PubMed
Summary
This summary is machine-generated.

Related Concept Videos

You might also read

Related Articles

Articles linked to this work by shared authors, journal, and citation graph.

Sort by
Same author

An Early Trial-Based Cost-Effectiveness Analysis of Extracorporeal Shockwave Therapy for Diabetes Related Foot Ulcer Healing.

International wound journal·2026
Same author

Extracorporeal Shockwave Therapy for Diabetes Related Foot Ulcers: A Pilot Three-Arm Double-Blinded Randomised Controlled Trial.

International wound journal·2025
Same author

Renal impairment risk in Indigenous and non-Indigenous people who take HIV pre-exposure prophylaxis (PrEP): a retrospective cohort study.

Sexual health·2025
Same author

A Pilot Three Arm Randomised Controlled Trial and Qualitative Study of Extracorporeal Shockwave Therapy for Diabetic Foot Ulcer Healing (SOLEFUL): A Study Protocol.

International wound journal·2025
Same author

The development of an EU-wide nutrition and physical activity expert knowledge base to support a personalised mobile application across various EU population groups.

Nutrition bulletin·2024
Same author

USA Department of Defense audit of surgical antibiotic prophylaxis prescribing patterns in inguinal hernia repair.

Hernia : the journal of hernias and abdominal wall surgery·2020
Same journal

US Food and Drug Administration Seeks Input From Healthcare Technology Management Community on Medical Device Supply Disruption During COVID-19 Pandemic.

Journal of clinical engineering·2021
Same journal

Observations on COVID-19.

Journal of clinical engineering·2021
Same journal

Medical computing over the World Wide Web: use of forms and CGI scripts for constructing medical algorithm Web pages.

Journal of clinical engineering·1999
Same journal

Utilization of the Internet to deliver educational materials to healthcare professionals.

Journal of clinical engineering·1999
Same journal

Computer-aided learning--a solution for the training needs of users & maintainers of medical equipment.

Journal of clinical engineering·1999
Same journal

A study on the current situation in the biomedical technology and clinical engineering sector in Bulgaria--advances, trends and needs.

Journal of clinical engineering·1999
See all related articles

Clinical engineering quality assurance planning must align with healthcare goals for improved patient outcomes. Careful selection of performance indicators and thresholds is essential for effective quality management in healthcare settings.

Area of Science:

  • Healthcare Management
  • Clinical Engineering
  • Quality Assurance

Background:

  • Healthcare organizations require performance improvements, particularly in clinical engineering, as mandated by Joint Commission Plant Technology and Safety Management (PTSM) documents.
  • Quality assurance in healthcare services aims to establish performance requirements and enhance patient outcomes.
  • Effective clinical engineering quality assurance planning necessitates prioritizing these overarching healthcare goals.

Purpose of the Study:

  • To emphasize the importance of aligning clinical engineering quality assurance planning with broader healthcare service quality goals.
  • To guide the selection of appropriate performance indicators and thresholds within clinical engineering programs.

Main Methods:

  • Review of Joint Commission PTSM requirements.

Related Experiment Videos

  • Analysis of the relationship between quality assurance planning and patient outcome goals.
  • Framework development for selecting indicator/threshold pairs.
  • Main Results:

    • Performance improvements in clinical engineering are critical for meeting healthcare accreditation standards.
    • A logical connection between chosen indicators/thresholds and program goals is vital for effective quality assurance.
    • Prioritizing patient outcomes in planning ensures that quality assurance efforts are relevant and impactful.

    Conclusions:

    • Clinical engineering quality assurance must be strategically designed to support healthcare service quality and patient outcomes.
    • The selection of performance indicator/threshold pairs should be directly informed by the desired goals of the overall quality program.
    • Integrating PTSM requirements with patient-centered goals enhances the effectiveness of clinical engineering quality assurance.