Related Experiment Video
Updated: May 1, 2026

Structural Design and Manufacturing of a Cruiser Class Solar Vehicle
Published on: January 30, 2019
Preconstruction planning for a supportive material management system
Abstract:
Development of a construction or remodeling program for a materials management function is more than architectural and construction planning. If done properly, the process needs to consider issues and concerns much broader than those traditionally faced by the materials manager. By following these steps and insisting on the input of many disciplines within the hospital, the materials manager can minimize both the frustration which normally surrounds facilities development and the time required for the process. Most importantly, the completed materials management department will maintain its effectiveness longer because it has correctly anticipated the future.
Related Concept Videos
Planning Nursing Care I
Planning Nursing Care II
Methods of Documentation II: POMR
Methods of Documentation VI: Case Management Model
For example, a patient with a chronic...
Design Example: Dimensioning of Concrete Masonry Construction
The site engineer has laid out a plan for the storeroom with external dimensions of twelve feet in length and...
Design Example: Managing Concrete Workability

