Risk based urban watershed management under conflicting objectives
Related Experiment Video
Updated: Oct 7, 2026

Watershed Planning within a Quantitative Scenario Analysis Framework
Published on: July 24, 2016
V Novotny1, D Clark, R J Griffin
1Institute for Urban Environmental Risk Management, Marquette University, Milwaukee, WI 53201-1881, USA.
Abstract:
Ecological impairment and flooding caused by urbanization can be expressed numerically by calculating the risks throughout the watershed (floodplain) and along the main stems of the streams. The risks can be evaluated in terms of the present and/or future. This article describes the methodologies for ascertaining the risks in the Geographical Information Systems (GIS) environment. The objectives of urban flood controls and ecological preservation/restoration of urban waters are often conflicting and, in the past, the sole emphasis on flood control led to destruction of habitat and deterioration of water quality. An optimal solution to these two problems may be achieved by linking the risks to the concepts of risk communication, risk perception, and public willingness to pay for projects leading to ecological restoration and ecologically sustainable flood control. This method is appropriate because, in each case, public funds are used and the projects require approval and backing of policy makers and stakeholders. This article briefly describes a research project that attempts to resolve the conflict between the flood protection and stream ecological preservation and restoration and suggests alternative ways of expressing benefits of urban stream flood control and restoration projects.
Related Concept Videos
Design Example: Analyzing Capacity Contours for Flood Risk Assessment
Microbial Wastewater Treatment
Applications of GIS: Disaster Management and Emergency Response
Conservation of Mass in Moving, Nondeforming Control Volume
In the context of a detention basin, the conservation of mass states that the total mass of water entering the basin must equal the mass leaving the basin plus any accumulation of...
Design Example: Maintaining Level of an Embankment
Strategies for Assessing and Addressing Confounding
Confounding can be addressed at both the design phase of a study and through analytical methods after data...
