Mesocosm-Scale Constructed Wetland Design for Wastewater Treatment
Published on: May 2, 2025
Start-up performance of a subsurface-flow constructed wetland for domestic wastewater treatment
1Department of Civil Engineering, University of Nebraska-Lincoln, W348 Nebraska Hall, Lincoln, NE 68588, USA.
Abstract:
Constructed wetlands have been shown to provide sufficient domestic wastewater treatment in temperate climates. However, the effectiveness of this technology, when subjected to severe temperature extremes during start-up conditions, is limited. Because of the growing interest in constructed wetland technology within smaller communities located in colder-climates, and the need for cost-effective treatment systems, this paper presents the performance of a constructed wetland system during the first two-years of operation under a variety of loading and operating conditions associated with northern climates. While the treatment performance of constructed wetland systems has been widely documented within the literature, documentation on performance during start-up stages has been limited. The results indicate that effective and sufficient constructed wetland seasonal removals of total suspended solids, volatile suspended solids, 5-day carbonaceous biochemical oxygen demand, chemical oxygen demand, and fecal coliform were achieved within the wetland cell during the first two-years of operation. Wastewater temperatures appeared to affect 5-day carbonaceous biochemical oxygen demand and chemical oxygen demand removal rates. Nitrogen and phosphorus reductions were not as effective and varied seasonally, as well as with wastewater temperature.
More Related Videos
05:40Comparison of Scale in a Photosynthetic Reactor System for Algal Remediation of Wastewater
Published on: March 6, 2017
09:49Use of a Battery of Chemical and Ecotoxicological Methods for the Assessment of the Efficacy of Wastewater Treatment Processes to Remove Estrogenic Potency
Published on: September 11, 2016
Related Concept Videos
Bode Plots Construction
Construction of Root Locus
For positive gain values, the root locus exists on the real axis to the left of an odd number of finite open-loop poles or zeros. The root locus starts at the open-loop poles and traces the paths of the closed-loop poles as the gain...
Construction of Frequency Distribution
First, make a table with two columns—one with the title of the data that needs to be organized, and the other column for frequency. [Draw a third column for tally marks if needed]. Then, take a look at the items given in the data set and decide if an ungrouped frequency distribution table or a grouped frequency distribution table would be more suitable. If there are large sets of different values, then it is...
Pathophysiology of Cardiac Performance
Exercise and Muscle Performance
Endurance exercises
Endurance exercises involve running, swimming, or cycling, which require repetitive movements with low force output. When a person engages in endurance exercise, a few noticeable changes occur in their skeletal muscles. For instance, the number of capillaries...
Gene Flow