Related Experiment Video
Updated: Aug 11, 2026

Design and Construction of an Urban Runoff Research Facility
Published on: August 8, 2014
Subsurface-flow constructed wetlands treatment in the plains: five years of experience
1University of Nebraska-Lincoln, Department of Civil Engineering, 68588-0531, USA.
Abstract:
This paper documents the performance of a subsurface-flow constructed wetlands system during its initial five years of operation under variable loading and operating conditions associated with a northern midwestern US climate. The results indicate that effective and sufficient CW seasonal removals of TSS, VSS, CBOD5, COD, and fecal coliform were achieved. Wastewater temperatures seemed to affect CBOD5 and COD removal rates. Nitrogen and phosphorus reductions were not as effective and varied seasonally, as well as with wastewater temperature. The addition of a sand filter, to aid in further nitrification and disinfection following CW treatment, markedly improved the performance of the wetlands system. After a few years of operation, the remarkable performance of the CW system was dampened by apparent clogging and subsequent eruption of wastewater at the head-end of the treatment cells. While clogging was partially caused by biomass build-up in the wetlands substrate, visual observations suggest that excessive vegetation coupled with relaxed maintenance may also be responsible for clogging.
Related Concept Videos
Gradually Varying Flow
Rapidly Varying Flow
Weir: Problem Solving
Design Example: Design of an Irrigation Channel
Microbial Wastewater Treatment
Biological Treatment of Effluent and Waste Water