Preparation and implementation of seven ecological compensation plans for Dutch highways
Related Experiment Video
Updated: Oct 1, 2026

Implementation of Portable Emissions Measurement Systems (PEMS) for the Real-driving Emissions (RDE) Regulation in Europe
Published on: December 4, 2016
Ruud Cuperus1, Marleen Kalsbeek, Helias A Udo De Haes
1Ministry of Transport, Public Works and Water Management, Directorate-General of Public Works and Water Management, Road and Hydraulic Engineering Division, P.O. Box 5044, 2600 GA Delft, The Netherlands. r.cuperus@dww.rws.minvenw.nl
Abstract:
First-generation compensation plans (CPs) for Dutch highway projects have been evaluated with respect to implementation of the compensation principle (1993), which aims to counterbalance the adverse ecological impacts of large-scale development projects. Decision-making on the seven projects took place between 1993 and 1995. Specifically, we considered: (a) the processes employed to prepare and implement the compensation plans; (b) the methods used to identify, plan, and execute the compensation measures; and (c) the results yielded by these methods. We conclude that the CPs were prepared fairly uniformly, particularly in terms of the processes and methodologies used to derive compensation measures. Five of the seven CPs had become operational by 2001 and initial experience is now being gained on land acquisition and transfer of compensation sites to nature conservation trusts. Further progress of CPs is likely to be seriously hampered by growing demand for land for development in general and associated increases in real estate prices. Several problems are addressed and recommendations made with respect to: (a) developing a legal basis for the compensation principle; (b) the relationship with re-allotment projects; (c) estimation of compensation costs; (d) an annual bias of CP budgets to account for rising costs; (e) contingency measures; and (f) criteria for CP (ex-post) evaluation.
Related Concept Videos
Design Example: Alignment of a Road Line Using GIS
Design Example: Analyzing Capacity Contours for Flood Risk Assessment
Design Example: Sustainability in Concrete Building
There are multiple approaches to achieve sustainability in a commercial concrete building. For instance, construct a concrete parking area under the building, utilizing pervious concrete paver blocks in open areas to facilitate rainwater collection through an underground cistern.
Manipulation and Analysis
PD Controller: Design
Designing a continuous-data controller requires selecting and linking components like adders and integrators, which are fundamental in Proportional,...
Topographic Surveying and Contours