Testing the effect of selectors in the control of bulking and foaming in full scale activated-sludge plants

D Davoli1, P Madoni, L Guglielmi

  • 1AGAC, Reggio Emilia, Italy.

Related Concept Videos

Testing Water Quality01:14

Testing Water Quality

When the quality of water for concrete preparation is uncertain, its impact on the setting time of cement and compressive strength of mortar is assessed by comparison with de-ionized or distilled water benchmarks. American Society for Testing and Materials (ASTM) C1602 requires the setting times to be within 90 minutes of the control, British Standard (BS) 3146:1980 allows a 30-minute variance in the initial setting, while British Standards European Norm (BS EN) 1008 specifies initial setting...
Bioreactor Controls-II01:18

Bioreactor Controls-II

In aerobic fermentations, oxygen is vital for microbial growth and metabolite production. Since air comprises only about 20% oxygen and the gas is poorly soluble in water—just 9 ppm at 20°C—supplying sufficient oxygen becomes a critical challenge, especially in high-demand processes like yeast growth or citric acid production. Even a fully saturated broth may offer only a few seconds of oxygen availability.To address this, sterile or scrubbed air is introduced into the fermentor via a sparger...
Biological Treatment of Effluent and Waste Water01:30

Biological Treatment of Effluent and Waste Water

Biological wastewater treatment relies on the metabolic activity of microorganisms to remove pollutants from sewage. In modern treatment systems, this process is organized into sequential stages that progressively reduce solid material, dissolved organic matter, and microbial contamination. Each stage plays a distinct role in improving water quality and preparing the effluent for safe discharge or reuse.Primary and Secondary TreatmentPrimary treatment is a physical process that removes large...