Related Experiment Video
Updated: Sep 28, 2026

Vegetated Treatment Systems for Removing Contaminants Associated with Surface Water Toxicity in Agriculture and Urban Runoff
Published on: May 15, 2017
Sydney tar ponds: some problems in quantifying toxic waste
1IMAF Group, 184 Marlborough Avenue, Ottawa, Ontario, Canada, K1N 8G4.
Abstract:
Information on the type and amount of hazardous and toxic waste is required to develop a meaningful strategy and estimate a realistic cost for clean up of the Sydney Tar Pond site which is located on Cape Breton, in the province of Nova Scotia, Canada. The site covers the area of the decommissioned Sysco (Sydney Steel Corporation) plant. The materials of concern include BTEX (benzene, toluene, ethylbenzene, and xylenes), PAH (polycyclic aromatic hydrocarbons), PCB (polychlorinated biphenyl), and particulates laden with toxic metals, such as arsenic, lead, and others. The originally nontoxic materials such as soil, blast furnace slag, and vegetation, as well as surface and ground waters, which were subsequently contaminated, must also be included if they fail tests prescribed by environmental regulations. An extensive sampling program must be undertaken to obtain data for an accurate estimate of the waste to be cleaned and disposed of. Apparently, 700,000 tons of toxic waste, which is believed to be present on the site, may represent only a fraction of the actual amount. The clean-up of the site is only part of the solution. Toxic waste has to be disposed of in accordance with environmental regulations.
More Related Videos
16:02Demonstration of the Sequence Alignment to Predict Across Species Susceptibility Tool for Rapid Assessment of Protein Conservation
Published on: February 10, 2023
00:05In Silico Modeling Method for Computational Aquatic Toxicology of Endocrine Disruptors: A Software-Based Approach Using QSAR Toolbox
Published on: August 28, 2019