Related Experiment Video
Updated: Aug 4, 2026

VacuSIP, an Improved InEx Method for In Situ Measurement of Particulate and Dissolved Compounds Processed by Active Suspension Feeders
Published on: August 3, 2016
Percivall Pott and the miners of Cornwall
1Division of Neurosurgery, Cook County Hospital, Chicago, Illinois 60612, USA. jlstone4@aol.com
Abstract:
Percivall Pott (1714-1788) was an astute and prolific mid-eighteenth century English surgeon with a strong interest in head injury. He was partial to the use of the trephine for all skull fractures and favoured early exploratory trephination when an intracranial collection could not be ruled out. If haemorrhage or abscess was beneath the dura, it was incised. Later in eighteenth century England and France, trephination fell out of favour. This was especially so in the crowded hospitals where putrid conditions were common. Surprisingly, on the remote southwestern English peninsula of Cornwall, where compound depressed skull fractures in miners were a frequent occurrence, Pott's principles prevailed unchanged. Generations of surgeons trephined early in suspected cranial fractures, without waiting for symptoms of compression or irritation. A large percentage of patients recovered. Those who died generally had diffuse injury, brain laceration, or a fractured base. The Atlantic breezes were believed beneficial to recovery. The operation of early 'preventive' trephination continued in the Cornish mining districts through the 1870s, when antiseptic methods were gradually adopted as elsewhere in England. Head injuries in miners became less common as mining reforms were introduced and head protection improved.
More Related Videos
Related Concept Videos
Potentiometer
Suppose the emf of a battery needs to be measured. If the battery is directly connected to a standard voltmeter, the measured quantity is...
Pleura of the Lungs
Quarrying of Stone
One common method involves using a diamond belt saw to cut large blocks from the quarry face. These blocks can be about 50 feet long and 12 feet high. After the initial vertical cut, drilling is performed at the base of the block.
Masonry Paving
Portland Cement
Soundness of Cement

