Related Experiment Video
Updated: Aug 18, 2026

Murine Appendectomy Model of Chronic Colitis Associated Colorectal Cancer by Precise Localization of Caecal Patch
Published on: August 24, 2019
[Acute appendicitis. Usefulness of a evidence-based critical pathway]
J M Gutiérrez Dueñas1, F J Lozano, R Díez Pascual
1Servicio de Cirugía Pediátrica, Hospital General Yagüe Avda, del Cid, 96, 09005 Burgos.
Insights
Implementing a clinical pathway for pediatric acute appendicitis significantly reduced hospital stays and antibiotic use. This evidence-based approach proved safe and efficient for managing appendicitis in children.
Area of Science:
- Pediatric Surgery
- Clinical Pathways
- Appendicitis Management
Background:
- Acute appendicitis is a common surgical emergency in children.
- Standard treatment protocols may vary, impacting resource utilization and patient outcomes.
- Optimizing care pathways is crucial for efficient pediatric healthcare.
Purpose of the Study:
- To evaluate the effectiveness of an evidence-based clinical pathway for pediatric acute appendicitis.
- To compare outcomes between patients managed via a clinical pathway and those receiving conventional care.
- To assess the impact on hospitalization duration, antibiotic use, and complication rates.
Main Methods:
- A prospective study comparing 114 pediatric patients (3-14 years) on a clinical pathway with 115 historical controls treated conventionally.
- Key outcome measures included length of hospital stay, antibiotic doses, and complication rates.
- Statistical analysis compared demographic and clinical data between the two groups.
Main Results:
- No significant differences were observed in age, gender, or appendicitis type between groups.
- The clinical pathway group experienced a significantly shorter hospital stay (4.34 vs. 5.33 days) and reduced antibiotic doses (11.17 vs. 16.13).
- Major complications were lower in the pathway group (6 vs. 16), though not statistically significant (p=0.09).
Conclusions:
- Clinical pathways are effective and safe tools for managing pediatric acute appendicitis.
- Implementation leads to decreased hospitalization length and antibiotic administration.
- This approach maintains the quality of care for children with appendicitis.
Objective:
To determine the effects of an evidence-based clinical pathway for acute appendicitis in paediatric patients at a tertiary hospital.
Methods:
We studied 229 patients with an age range from 3 to 14 years, with a pathological diagnosis of acute appendicitis divided in two groups. A prospective, experimental clinical pathway group of children (n = 114), (June 1999-January 2001) was compared with a historical control prepathway group of patients treated by conventional means in the previous years, (n = 115), (December 1997-May 1999). Age, gender, type of appendicitis (uncomplicated/complicated), length of hospitalisation, number of antibiotics doses supplied and rates of complications, were compared between pathway and and control patients.
Results:
There were no differences in age (p = 0.61), gender (p = 0.73), either the number of complicated/uncomplicated appendicitis (p = 0.91) between the two groups. The average duration of hospitalisation was significantly shortened in pathway group (4.34 versus 5.33 days) (p = 0.000049) and the number of antibiotics doses were reduced from 16.13 to 11.17 doses (p = 0.000000). The number of major complications was lower in the pathway group than in the control group (6 and 16 respectively) but there was no significative difference (p = 0.09).
Conclusions:
Clinical pathway is an efficient and safe tool for acute appendicitis because decrease the length of hospitalisation and the number of antibiotics doses supplied, while maintaining quality of care.
More Related Videos
Related Concept Videos
Methods of Documentation VI: Case Management Model
For example, a patient with a chronic illness...
Appendicitis-I: Introduction
Etiology: Appendicitis can arise from various causes, primarily rooted in the obstruction of the appendix lumen. Factors contributing to this obstruction include fecal accumulation, lymphoid hyperplasia and, in...
Appendicitis-II: Diagnostic Studies and Management
Diagnosing Appendicitis
It requires a multifaceted approach, starting with a detailed physical examination to pinpoint the location and nature of the pain and identify any associated symptoms. Laboratory tests play a crucial role. A complete Blood Count (CBC) typically reveals leukocytosis (an increased number of...
Appendicitis

