Related Experiment Video
Updated: Aug 4, 2026

Continuous Instream Monitoring of Nutrients and Sediment in Agricultural Watersheds
Published on: September 26, 2017
Derivation of a salinity target for the Lower Murray Darling Valley
1NSW Department of Land and Water Conservation, PO Box 829, Albury NSW 2640, Australia.
Abstract:
The NSW Government commissioned catchment management boards (CMBs) to set the direction and process for catchment scale natural resource management. In the Lower Murray Darling, Rivers are highly regulated and water resources shared between three states. The Catchment Board only has jurisdiction over the northern bank of the Murray but salt and water enter the river from many locations upstream and along the area boundary. River salt and flow modelling has continually been improved to reflect and contribute to an increased understanding of salinity processes. The MDBC Salt Load study correlates 10 years of actual measured data with its modelled outputs, and estimates river salinities for 2020, 2050 and 2100. Routing models such as SALTFLO and MURKEY generate percentile salinity levels at different nodes in the River Murray downstream of the Lower Darling confluence. National, Murray-Darling Basin and NSW salinity management policy and legislative requirements were considered, MDBC model output was used to ensure the interim targets are achievable, auditable, and appropriate to the catchment. The method for an end-of-valley river based target for salinity is described. A target of less than 463 microS/cm for Lock 6, a point in the lower reaches of the Murray River is recommended for year 2010. Catchment management targets that express the main river salinity risk in five hydrologically distinct management zones are also recommended. Salinity management changes are needed in each zone to meet the end-of-valley target.
Related Concept Videos
Osmoregulation in Fishes
Responses to Salt Stress
Osmosis and Osmotic Pressure of Solutions
Design Example: Design of an Irrigation Channel
Design Example: Analyzing Capacity Contours for Flood Risk Assessment
Rate of Change: Problem Solving

