Related Experiment Video
Updated: Aug 9, 2026

A Method for Labeling Vasculature in Embryonic Mice
Published on: October 7, 2011
Vascular endothelial growth factor activation of intramembranous absorption: a critical pathway for amniotic fluid
1Division of Perinatal Medicine, Department of Reproductive Medicine, University of California at San Diego, La Jolla, California 92093-0802, USA. cucheung@ucsd.edu
Objective:
The purpose of this review is to propose a critical role for vascular endothelial growth factor (VEGF) in mediating the transfer of amniotic fluid from the amniotic compartment through the fetal membranes and fetal surface of the placenta into fetal blood.
Methods:
Experimental findings in humans and animal models on the action of VEGF in mediating fluid transfer are reviewed and interpreted in order to postulate a proposed mechanism for VEGF regulation of amniotic fluid absorption through the fetal membranes and placenta.
Results:
Recent scientific advances suggest that up-regulation of VEGF gene expression in the amnion and chorion is associated with increased transfer of amniotic fluid into fetal blood. The possible mechanisms of action for VEGF appear to involve regulation of intramembranous blood vessel proliferation and membrane transport via passive permeation as well as nonpassive transcytotic vesicular movement of fluid.
Conclusion:
Currently evolving concepts suggest that amniotic fluid volume is regulated through modulation of the rate of intramembranous absorption of amniotic fluid by both passive and nonpassive mechanisms. The permeability factor VEGF appears to be a critical regulator of amniotic fluid transport in the fetal membranes.
Related Concept Videos
Enlargement of the Plasma Membrane
Mechanism of Angiogenesis
Regulation of Angiogenesis and Blood Supply
Development of Blood Vessels
The initial formation of this system is facilitated by the small amount of yolk present in the ovum and yolk sac. Blood vessels originate from...
Fetal Circulation
Two umbilical arteries transport blood from the fetus to the placenta. At the placenta, the blood absorbs oxygen and nutrients while simultaneously eliminating waste products. This oxygen-enriched and nutrient-rich blood then returns to the fetus through one...

