An evaluation of scaffold safety at construction sites

Kopl M Halperin1, Michael McCann

  • 1The Center to Protect Workers' Rights, 8484 Georgia Avenue, Ste. 1000, Silver Spring, MD 20910, USA.

Abstract

Related Concept Videos

Design Consideration01:22

Design Consideration

Designing a structure involves a series of considerations, primarily the material's ultimate strength, calculated through tests that measure changes under increased force until the material reaches its breaking point or limit. The ultimate load, where the material breaks, is divided by its original cross-sectional area, resulting in the ultimate normal stress or strength. The ultimate shearing stress is another significant factor taken into account.
The factor of safety is another key aspect...
Survey Safety01:28

Survey Safety

Surveying near highways, rough terrain, or power lines involves significant risks. Working along highways is particularly dangerous and requires the use of warning signs and flagmen. It is safest to avoid working directly on roads and use offsets whenever possible. When highway work is unavoidable, it must follow all safety guidelines. Surveyors should wear bright clothing, such as orange reflective vests, to ensure visibility to motorists, coworkers, and hunters. In construction zones, wearing...
Design Example: Managing Concrete Workability01:14

Design Example: Managing Concrete Workability

This example deals with managing the workability of concrete for a raft foundation project under hot weather conditions. Workability is crucial for ensuring the concrete is easy to place, compact, and finish. In this scenario, a slump test — a common method to measure the workability of fresh concrete — initially indicated low workability. This was attributed to the rapid water loss from the concrete mix, exacerbated by the high temperatures causing the course aggregates to heat up.
To address...
Design Example: Maintaining Level of an Embankment01:19

Design Example: Maintaining Level of an Embankment

Constructing a roadway embankment over uneven terrain requires precise leveling to ensure stability and proper drainage. Surveyors use a leveling instrument and staff to calculate ground elevations and determine the required fill material at each point along the embankment alignment.The process begins by positioning a leveling instrument near a benchmark with a known elevation. A backsight reading establishes the instrument height, which serves as a reference for subsequent measurements. A...
Reinforced Brick Masonry01:15

Reinforced Brick Masonry

Reinforced brick masonry is an advanced construction technique that enhances the structural integrity of brick walls by incorporating steel reinforcements. These reinforcements are either placed within the hollow cores of bricks or sandwiched between two layers of masonry, known as wythes, and are then secured in place with grout. Grout is a fluid mixture composed of Portland cement, aggregate, and water, providing the necessary bonding agent for the steel and brick.
To fortify brick walls...
Deleterious Substances in Aggregate01:25

Deleterious Substances in Aggregate

Deleterious substances in aggregates can be detrimental to the quality and durability of concrete. These substances include organic impurities like loam, which interfere with cement hydration and are usually present in the sand. These prevent a good bond between aggregate and cement paste. Organic impurities can be detected using the colorimetric test, where the darkness of a solution after agitation indicates the level of organic content.
Another type of impurity is clay and fine material that...