Related Experiment Video
Updated: Aug 23, 2026

A Test Bed to Examine Helmet Fit and Retention and Biomechanical Measures of Head and Neck Injury in Simulated Impact
Published on: September 21, 2017
Safety investigation of team performance in accidents
1Department of Thermal and Nuclear Power Engineering, Technical University of Sofia, 8 Kliment Ohridski Street, Room 2356, 1797, Bulgaria. gip@tu-sofia.bg
Abstract:
The paper presents the capacities of the performance evaluation of teamwork (PET) method. Its practicability and efficiency are illustrated by retrospective human reliability analyse of the famous nuclear and maritime accidents. A quantitative assessment of operators' performance on the base of thermo-hydraulic (T/H) calculations and full-scope simulator data for set of NPP design basic accidents with WWER is demonstrated. The last data are obtained on the 'WWER-1000' full-scope simulator of Kozloduy NPP during the regular practical training of the operators' teams. An outlook on the "evaluation system of main control room (MCR) operators' reliability" project, based on simulator data of operators' training is given.
Related Concept Videos
Design Consideration
The factor of safety is another key aspect...
Types of Reports II: Incident or Occurrence Report
Purposes:
In the healthcare industry, reports play a crucial role in documenting incidents within an agency. The primary objective of these reports is to ensure patient safety, uphold the...
Obedience
