Related Experiment Video
Updated: Aug 21, 2026

Watershed Planning within a Quantitative Scenario Analysis Framework
Published on: July 24, 2016
Elements of a predictive model for determining beach closures on a real time basis: the case of 63rd Street Beach
Greg A Olyphant1, Richard L Whitman
1Department of Geological Sciences and Center for Geospatial Data Analysis, Indiana University, Bloomington, Indiana, USA. olyphant@indiana.edu
Abstract:
Data on hydrometeorological conditions and E. coli concentration were simultaneously collected on 57 occasions during the summer of 2000 at 63rd Street Beach, Chicago, Illinois. The data were used to identify and calibrate a statistical regression model aimed at predicting when the bacterial concentration of the beach water was above or below the level considered safe for full body contact. A wide range of hydrological, meteorological, and water quality variables were evaluated as possible predictive variables. These included wind speed and direction, incoming solar radiation (insolation), various time frames of rainfall, air temperature, lake stage and wave height, and water temperature, specific conductance, dissolved oxygen, pH, and turbidity. The best-fit model combined real-time measurements of wind direction and speed (onshore component of resultant wind vector), rainfall, insolation, lake stage, water temperature and turbidity to predict the geometric mean E. coli concentration in the swimming zone of the beach. The model, which contained both additive and multiplicative (interaction) terms, accounted for 71% of the observed variability in the log E. coli concentrations. A comparison between model predictions of when the beach should be closed and when the actual bacterial concentrations were above or below the 235 cfu 100 ml(-1) threshold value, indicated that the model accurately predicted openings versus closures 88% of the time.
Related Concept Videos
Steps in Outbreak Investigation
Design Example: Analyzing Capacity Contours for Flood Risk Assessment
Prediction Intervals
However, the point estimate is most likely not the exact value of the population parameter, but close to it. After calculating point estimates, we construct interval estimates, called confidence intervals or prediction intervals. This prediction interval comprises a range of values unlike the point estimate and is a better predictor of the observed sample value, y.
The...
Residuals and Least-Squares Property
If the observed data point lies above the line, the residual is positive, and the line underestimates the actual data value for y. If the observed data point lies below the line, the residual is negative, and the line overestimates the actual data value for y.
The process of fitting the best-fit...
Critical Numbers and the Closed Interval Method
Response Surface Methodology
The process of RSM involves several key steps:
