Related Experiment Video
Updated: Aug 12, 2026

Design and Construction of an Urban Runoff Research Facility
Published on: August 8, 2014
Sediment accumulation in newly constructed vegetative treatment facilities along a new major road
1Symonds Group Limited, Symonds House, Wood Street, East Grinstead, West Sussex RH19 1UU, UK. Robert.Hares@Symonds-group.com
Abstract:
The A34 Newbury bypass was opened in England in November 1998. This 15 km of roadway has nine constructed vegetative treatment systems incorporating oil separators, silt traps, grass filters for primary filtration and chemical absorption, reed wetlands for secondary biofiltration, a deep water pool and outflow device to control the rate of water discharge into existing watercourses. Two of these facilities discharge stormwater into the Lambourn sites of special scientific interest (SSSI) river. An evaluation of the heavy metal levels in these two ponds (Ponds J and K) has been undertaken in the 39-month period after the opening of the bypass. Motorway-derived contaminants including Pb, Cd, Cu and Zn were evaluated within pond sediment throughout these treatment facilities. Results reveal that heavy metal levels within the treatment system that possesses a well-established reed bed system decrease rapidly though the facility. It is postulated that the high reed biomass within this facility may be primarily responsible for reducing hydraulic flow thus allowing a greater residence time for sedimentation, filtration and bioaccumulation processes.
Related Concept Videos
Preplaced Aggregate Concrete
Design Example: Aggregate Gradation
The grading, or particle-size distribution, of sand is determined using sieve analysis, with standard sizes ranging from 150 μm to 10 mm (ASTM No. 100 sieve to 3⁄8 in. sieve). Sand is sampled...
Design Example: Maintaining Level of an Embankment
Conservation of Mass in Moving, Nondeforming Control Volume
In the context of a detention basin, the conservation of mass states that the total mass of water entering the basin must equal the mass leaving the basin plus any accumulation of...
Design Example: Analyzing Capacity Contours for Flood Risk Assessment
Microbial Wastewater Treatment

