Related Experiment Video
Updated: Aug 21, 2026

Development of Sulfidogenic Sludge from Marine Sediments and Trichloroethylene Reduction in an Upflow Anaerobic Sludge Blanket Reactor
Published on: October 15, 2015
Treatment of landfill leachate by a pilot-scale modified Ludzack-Ettinger and sulfur-utilizing denitrification
1Dept of Civil and Environmental Eng Inha Univ Inchon, Korea. jhb@inha.ac.kr
Abstract:
Nitrogen removal efficiency of a pilot-scale system consisted of Modified Ludzack-Ettinger (MLE) followed by sulfur-utilizing denitrification (SUDNR) process was evaluated with a landfill leachate. For SUDNR, a down-flow mode sulfur packed bed reactor (SPBR) filled with sulfur and limestone particles was used. Although total nitrogen removal efficiency of the MLE process was about 80% at the recycle ratio of 4, effluent contained 350-450 mg/L NO(3-)-N. Up to a loading rate of 1.2 kg NO(3-)-N/m3-day, the SPBR could achieve complete removal of nitrate, and nitrate removal rate was kept to that level even at higher loading rate. When a COD/N ratio of MLE process was maintained at 2 instead of 4, more organics with molecular weight less than 500 were utilized for heterotrophic denitrification although denitrification was not complete with the lack of electron donors. Clogging in the SPBR, mainly by the accumulation of nitrogen gas in the pores, could easily be removed by introducing the effluent in an upward direction for 1 min at 1 hr intervals. The proposed treatment system could achieve nitrate free effluent with a slight increase in chemical cost. Furthermore, depending on further COD removal requirement after biological treatment, the proposed treatment system can be an economical solution.
Related Concept Videos
Microbial Leaching
Microbial Wastewater Treatment
Biological Treatment of Effluent and Waste Water
Acid Mine Drainage
Scale-Up Processes
Production of Organic Acids

