Wastewater stabilisation ponds: Sludge accumulation, technical and financial study on desludging and sludge disposal
B Picot1, J P Sambuco, J L Brouillet
1Department Sciences de l'Environnement et Santé Publique, UMR 5569 Hydrosciences- UM1, Faculté de Pharmacie, BP 1149, 34093 Montpellier cedex 5, France. picot@univ-montp1.fr
Abstract:
Waste stabilisation pond treatment was widely developed during the 1980s in France, where there are now over 3,000 plants. Desludging the ponds has now become essential. In 19 primary facultative ponds, in operation for 12-24 years, the net average sludge accumulation rate was 19 mm/yr. The average per capita accumulation rates ranged from 0.04-0.148 m3/person.year (mean of 0.08 m3/person.year). In primary facultative ponds the volume of sludge represented 15-39% of the total volume of the basin. A filling rate above 30% necessitates desludging. In France, a desludging interval of 15 years is recommended for primary facultative ponds. The cost evaluation of desludging and landspreading showed differences according to the desludging technique used. Desludging after emptying the water had an average cost of 38 Euro/m3 of sludge with 10% dry solid (range from 20 to 83 Euro/m3). Under-water desludging was 50% more expensive. Although desludging is carried out only after several years of operation, its cost must be allowed for in the annual operation and maintenance costs of the process. It can be estimated to be 3 ł/person.year. Even with this additional cost, waste stabilisation pond treatment remains less expensive than other treatment processes.
More Related Videos
Related Concept Videos
Biological Treatment of Effluent and Waste Water
Microbial Wastewater Treatment
Biofuels