Design and Construction of an Urban Runoff Research Facility
Published on: August 8, 2014
Construction of a test embankment using a sand-tire shred mixture as fill material
Sungmin Yoon1, Monica Prezzi, Nayyar Zia Siddiki
1School of Civil Engineering, 550 Stadium Mall Drive, Purdue University, West Lafayette, IN 47907-1284, USA.
Abstract:
Use of tire shreds in construction projects, such as highway embankments, is becoming an accepted way of beneficially recycling scrap tires. However, in the last decade there was a decline in the use of pure tire shreds as fill materials in embankment construction, as they are susceptible to fire hazards due to the development of exothermic reactions. Tire shred-sand mixtures, on the other hand, were found to be effective in inhibiting exothermic reactions. When compared with pure tire shreds, tire shred-sand mixtures are less compressible and have higher shear strength. However, the literature contains limited information on the use of tire shred-soil mixtures as a fill material. The objectives of this paper are to discuss and evaluate the feasibility of using tire shred-sand mixtures as a fill material in embankment construction. A test embankment constructed using a 50/50 mixture, by volume, of tire shreds and sand was instrumented and monitored to: (a) determine total and differential settlements; (b) evaluate the environmental impact of the embankment construction on the groundwater quality due to leaching of fill material; and (c) study the temperature variation inside the embankment. The findings in this research indicate that mixtures of tire shreds and sand are viable materials for embankment construction.
More Related Videos
Related Concept Videos
Design Example: Maintaining Level of an Embankment
Design Example: Aggregate Gradation
The grading, or particle-size distribution, of sand is determined using sieve analysis, with standard sizes ranging from 150 μm to 10 mm (ASTM No. 100 sieve to 3⁄8 in. sieve). Sand is sampled...
Slump Test
Concrete is poured into the mold in three layers to conduct the test. Each layer is compacted 25 times with a steel tamping rod, which has a five-eighths-inch diameter and a rounded end, to ensure even distribution and eliminate...
Vebe Test
To conduct the test, concrete is placed into the slump cone. The concrete is filled in layers and...
Abrasion Resistance of Concrete
One such test is the revolving disc test, where three plates...
Compacting Factor test
The procedure begins by placing concrete into the upper hopper without any compaction. Once filled, the bottom door of this hopper is opened,...