Related Experiment Videos
Mortality and morbidity among bridge and tunnel construction workers who worked long hours and long days constructing
Finn Tüchsen1, Harald Hannerz, Søren Spangenberg
1National Institute of Occupational Health, Lersø Parkallé 105, DK-2100 Copenhagen, Denmark. ft@ami.dk
Objectives:
This study aimed at estimating the mortality and morbidity of hospital treatment among bridge and tunnel workers who worked round the clock, long hours, and long weeks to construct the Great Belt Fixed Link.
Methods:
A cohort of all Danish workers in the construction industry was followed for death and first hospitalization and outpatient or emergency ward treatment over 6 years. Standardized mortality and morbidity ratios (SMR) were calculated for selected diagnoses, and 5123 bridge and tunnel construction workers were compared with all 109 383 Danish construction workers.
Results:
The comparison showed an overall SMR of 124 with a 95% confidence interval (95% CI) of 97-155. For infectious diseases and intestinal infectious diseases, the corresponding values were 156 (95% CI 132-184) and 167 (95% CI 117-230), respectively. For diseases of the nervous system, it was 138 (95% CI 118-160), and including nerve, nerve root and plexus disorders it was 135 (95% CI 104-171), for instance, mononeuropathies of the upper limbs (SMR 136, 95% CI 101-180). The SMR was 139 (95% CI 126-153) for circulatory diseases, 157 (95% CI 130-189) for ischemic heart disease, 129 (95% CI 114-146) for diseases of the respiratory system, 124 (95% CI 114-135) for diseases of the digestive system, and 115 (95% CI 108-123) for diseases of the musculoskeletal system and connective tissue, including other intervertebral disc disorders (than cervical) (SMR 130, 95% CI 109-154).
Conclusions:
Bridge and tunnel workers who work round the clock, long hours, and long weeks have a mortality rate that is as high as that of other construction workers, and they are treated more often in hospitals.
Related Concept Videos
Survey Safety
Posttensioned Masonry Walls
Post-tensioned masonry walls use high-strength steel rods or flexible tendons to enhance the strength and efficiency of masonry structures. These elements are securely anchored to the foundation and extend vertically either within the cores of the masonry units or between the masonry wythes. The construction process involves building the wall with these tensioning elements in place and allowing the mortar to fully cure.
Following the curing process, the tensioning begins. Steel rods are...
Reinforced Brick Masonry
To fortify brick walls...
Effects of Creep
Masonry in Cold and Hot Weather Conditions
Other key practices include keeping masonry units and sand dry and...
Indeterminate Structure