Movement of unlined landfill under preloading surcharge

Anwar F Al-Yaqout1, Mohamed F Hamoda

  • 1Department of Civil Engineering, Kuwait University, P.O. Box 5969, Safat 13060, Kuwait. aalyaqout@yahoo.com

Summary

Landfill settlement, caused by waste decomposition, impacts site redevelopment. This study measured soil/solid waste movement and water behavior in a Kuwait landfill, revealing continued decomposition and significant movement under preloading.

Related Concept Videos

Residual Stresses in Bending01:18

Residual Stresses in Bending

In the study of elastoplastic members subjected to bending moments, understanding the loading and unloading phases is crucial for assessing material behavior and structural integrity. During the loading phase, as the bending moment increases, the material initially responds elastically, adhering to Hooke's Law, where stress is directly proportional to strain. When the load exceeds the yield strength, plastic deformation occurs, resulting in permanent strain and deformation that remains even...
Placing Concrete01:17

Placing Concrete

The concrete is placed as close as possible to its final position to avoid segregation. The placed concrete is then fully compacted to expel the entrapped air, and the next layer of concrete is laid while the underlying layer is still in the plastic state. The rate at which concrete is placed and compacted is kept equal.
While placing concrete, care is taken to ensure that the concrete is laid in uniform layers, and hand shoveling and moving concrete using poker vibrators is avoided. Also,...
Preplaced Aggregate Concrete01:29

Preplaced Aggregate Concrete

Preplaced aggregate concrete is ideal for construction environments that are not easily accessible. The process begins by properly wetting the gap-graded coarse aggregates to remove the dirt, then placing it in the form and compacting it. Voids are filled with a mortar mix pumped under pressure through slotted pipes. This mortar typically consists of Portland cement, pozzolan, fine aggregates, water, and a fluidizing aid. The pozzolan helps reduce bleeding and segregation while improving the...
Design Example: Maintaining Level of an Embankment01:19

Design Example: Maintaining Level of an Embankment

Constructing a roadway embankment over uneven terrain requires precise leveling to ensure stability and proper drainage. Surveyors use a leveling instrument and staff to calculate ground elevations and determine the required fill material at each point along the embankment alignment.The process begins by positioning a leveling instrument near a benchmark with a known elevation. A backsight reading establishes the instrument height, which serves as a reference for subsequent measurements. A...
Conservation of Mass in Moving, Nondeforming Control Volume01:14

Conservation of Mass in Moving, Nondeforming Control Volume

Stormwater detention basins are essential in managing runoff during heavy rainfall, particularly in urban areas where impervious surfaces increase the risk of flooding. Understanding the conservation of mass in these systems allows engineers to optimize basin performance, balancing inflow, outflow, and water storage.
In the context of a detention basin, the conservation of mass states that the total mass of water entering the basin must equal the mass leaving the basin plus any accumulation of...
Design Example: Analyzing Capacity Contours for Flood Risk Assessment01:17

Design Example: Analyzing Capacity Contours for Flood Risk Assessment

Flood risk assessment involves careful planning and analysis to ensure the safety of communities near water retention structures. Capacity contours are a vital tool in this process, as they illustrate the potential spread of water at specific levels in a given area. In the context of building a bund across a small valley, these contours play a critical role in evaluating the safety of nearby residential areas.In this example, the bund is intended to store stormwater in the valley. The engineers...