Related Concept Videos

Diversity in Cell Signaling Responses01:22

Diversity in Cell Signaling Responses

The physiological function of a cell and cellular communication are outcomes of a range of extrinsic signals, intracellular signaling pathways, and cellular responses. No two cell types express the same repertoire of signaling components. Receptors are highly selective for their cognate ligands, but once activated, they can alter multiple cellular processes such as DNA transcription, protein synthesis, and metabolic activity. 
Graded and Abrupt Responses
Some signaling systems generate...
Overview of Cell Signaling01:23

Overview of Cell Signaling

Despite the protective membrane that separates a cell from the environment, cells need the ability to detect and respond to environmental changes. Additionally, cells often need to communicate with one another. Unicellular and multicellular organisms use a variety of cell signaling mechanisms to communicate with the environment.
Cells respond to many types of information, often through receptor proteins positioned on the membrane. For example, skin cells respond to and transmit touch...
Overview of Cell Signaling01:23

Overview of Cell Signaling

Despite the protective membrane that separates a cell from the environment, cells need the ability to detect and respond to environmental changes. Additionally, cells often need to communicate with one another. Unicellular and multicellular organisms use a variety of cell signaling mechanisms to communicate with the environment.
Cells respond to many types of information, often through receptor proteins positioned on the membrane. For example, skin cells respond to and transmit touch...
Interactions Between Signaling Pathways01:19

Interactions Between Signaling Pathways

Signaling cascades usually lack linearity. Multiple pathways interact and regulate one another, allowing cells to integrate and respond to diverse environmental stimuli.
Convergence and divergence, and cross-talk between signaling pathways
Two distinct signaling pathways can converge on a single functional unit, which may either be a single protein or a complex of proteins. The response is either functionally distinct or synergistic between the two pathways but different from the response...
Paracrine Signaling01:21

Paracrine Signaling

Paracrine signaling allows cells to communicate with their immediate neighbors via secretion of signaling molecules. Such a signal can only trigger a response in nearby target cells because the signal molecules degrade quickly or are inactivated if not taken up. Prominent examples of paracrine signaling include nitric oxide signaling in blood vessels, synaptic signaling of neurons, the blood clotting system, tissue repair/wound healing, and local allergic skin reactions. Nitric oxide as a...
Paracrine Signaling01:21

Paracrine Signaling

Paracrine signaling allows cells to communicate with their immediate neighbors via secretion of signaling molecules. Such a signal can only trigger a response in nearby target cells because the signal molecules degrade quickly or are inactivated if not taken up. Prominent examples of paracrine signaling include nitric oxide signaling in blood vessels, synaptic signaling of neurons, the blood clotting system, tissue repair/wound healing, and local allergic skin reactions. Nitric oxide as a...