Related Experiment Video
Updated: Aug 8, 2026

Measuring Phosphorus Release in Laboratory Microcosms for Water Quality Assessment
Published on: July 22, 2019
Introducing biological phosphorus removal in an alternating plant by means of control: a full scale study
C Rosen1, P Ingildsen, T Guildal
1Dept of Industrial Electrical Engineering and Automation, Lund University, Box 118, SE-221 00 Lund, Sweden. christian.rosen@iea.lth.se
Abstract:
In this paper, a control strategy for introducing enhanced biological phosphorus removal (EBPR) in an alternating plant designed for enhanced biological nitrogen removal (EBNR) is presented. Alternating aerobic and anaerobic conditions to promote EBPR are provided by controlling the phases of the operational cycle, instead of a separate anaerobic volume. By utilising the control schemes already built in the STAR control system for nitrogen removal, the control strategy is fully integrated in the system. The control system relies on on-line measurements of nitrogen (ammonia and/or nitrate) and orthophosphate. The control strategy has been implemented in full-scale operation at the Avedøre wastewater treatment plant in Denmark and the results show clear indications of success. The control strategy has operated robustly for several months with a 60% decrease in use of precipitation chemicals.
More Related Videos
06:35Implementation of a Hyperbolic Vortex Plasma Reactor for the Removal of Micropollutants in Water
Published on: July 25, 2025
08:21Optimized Procedure for Determining the Adsorption of Phosphonates onto Granular Ferric Hydroxide using a Miniaturized Phosphorus Determination Method
Published on: May 18, 2018
Related Concept Videos
Biological Treatment of Effluent and Waste Water
Bioremediation