Related Experiment Videos
Preference for less segmented fixed-time components in concurrent-chain schedules of reinforcement.
Journal of the Experimental Analysis of Behavior
|September 1, 1986
Summary
Pigeons showed a slight preference for tandem schedules over chained schedules when choosing between segmented reinforcement schedules. This preference decreased as the initial component length increased, impacting choice behavior.
Area of Science:
- Behavioral psychology
- Animal behavior
- Operant conditioning
Background:
- Concurrent-chain procedures are used to study choice behavior.
- Response-independent schedules of reinforcement involve stimuli presented at fixed or variable times, independent of the subject's responses.
- Segmenting interval schedules can alter choice patterns.
Purpose of the Study:
- To investigate pigeons' choice between segmented (chained) and less segmented (tandem) response-independent schedules of reinforcement.
- To examine how the length of the initial component in a chained schedule affects choice.
- To compare choice behavior under signaled and unsignaled delays of reinforcement.
Main Methods:
- A concurrent-chain procedure with concurrent variable-interval schedules in the initial link.
- Terminal links consisted of chained fixed-interval/fixed-time and tandem schedules.
- The fixed-interval schedule length varied (5-30s), while the fixed-time schedule remained constant (5s).
- Stimuli signaled the second component of the chained schedule, but not the tandem schedule.
Main Results:
- Pigeons generally preferred the tandem schedule over the chained schedule.
- This preference for tandem schedules decreased as the duration of the initial component increased.
- Results align with studies showing negative effects of schedule segmentation on choice.
Conclusions:
- Schedule segmentation, particularly with longer initial components, can adversely affect choice.
- Findings contrast with previous research suggesting a preference for signaled over unsignaled delays.
- The study highlights the influence of schedule structure and component length on reinforcement choice.