If you build it, they will come: lessons from developing walking trails in rural Missouri

Imogene Wiggs1, Ross C Brownson, Elizabeth A Baker

  • 1Department of Health and Senior Services, Poplar Bluff, Missouri, USA. wiggs@semo.net

Related Concept Videos

Design Example: Alignment of a Road Line Using GIS01:17

Design Example: Alignment of a Road Line Using GIS

The alignment of a road line using Geographic Information Systems (GIS) is a critical process in civil engineering, combining advanced technology with practical decision-making. This methodology begins with the collection of geospatial data, including information on land cover, geomorphology, drainage patterns, slope, and contour details. Such data is typically acquired through satellite imagery and GIS tools, offering a comprehensive understanding of the terrain.Once the data is gathered, it...
312
Field Procedure for Staking Out Curves01:26

Field Procedure for Staking Out Curves

Staking out curves is an essential process in construction to ensure the accurate alignment of structures along a curved path. This task involves positioning stakes at calculated locations corresponding to the curve's design, effectively translating plans into physical markers in the field. The process begins by determining the geometric parameters of the curve, including the radius, central angle, and tangent distances. These parameters are critical for identifying key points such as the...
403
Methods of Obtaining Topography01:25

Methods of Obtaining Topography

Topography involves measuring and mapping land elevations, natural features, and artificial structures to create accurate representations of the terrain. Topographic surveying relies on traditional and modern methods, each with distinct advantages and limitations.Traditional Surveying Methods:Transit stadia surveys and plane table surveys were widely used traditional surveying methods. These techniques relied on instruments like theodolites and stadia rods for measuring distances and angles,...
260
Adjusting a Traverse01:12

Adjusting a Traverse

In the site survey of a four-sided traverse, internal angles are essential to ensure geometric accuracy. The survey revealed that the sum of the measured internal angles was 359 degrees and 48 minutes, which is 12 minutes less than the expected 360 degrees. This discrepancy signals an error likely arising from measurement inaccuracies during the fieldwork.To rectify this error, the adjustment process involved distributing the 12-minute shortfall equally across the four internal angles. By...
343
Design Example: Maintaining Level of an Embankment01:19

Design Example: Maintaining Level of an Embankment

Constructing a roadway embankment over uneven terrain requires precise leveling to ensure stability and proper drainage. Surveyors use a leveling instrument and staff to calculate ground elevations and determine the required fill material at each point along the embankment alignment.The process begins by positioning a leveling instrument near a benchmark with a known elevation. A backsight reading establishes the instrument height, which serves as a reference for subsequent measurements. A...
381
Masonry Paving01:21

Masonry Paving

The construction of masonry paving involves using materials such as bricks, stones, and concrete masonry units. These materials are chosen for their shape, color, strength, and resistance to abrasion and weathering. Masonry units can be installed dry on a thin layer of sand and a gravel base, or they can be embedded in mortar or asphalt on a concrete slab. For areas subjected to heavy vehicular loads, a rigid base layer of reinforced or unreinforced concrete is recommended. In contrast,...
454