Travel time to a well pumping an unconfined aquifer without recharge

Robert P Chapuis1, Romain Chesnaux

  • 1Department of Civil, Geological, and Mining Engineering, Ecole Polytechnique de Montréal, Station CV, QC, Canada. robert.chapuis@polymtl.ca

Ground Water
|July 22, 2006
PubMed

Related Concept Videos

Pumped Concrete01:13

Pumped Concrete

Concrete in large quantities can be pumped across long distances for placing in inaccessible sites. This system comprises a hopper that receives concrete from a mixer, a pump to propel the concrete, and pipelines that facilitate its delivery.
For direct-acting pumps, the concrete enters the pump via the inlet valve under the action of gravity and suction created by the movement of the piston. This concrete is then forced into the pipeline and out through the outlet valve by the forward movement...
Application of the Energy Equation01:04

Application of the Energy Equation

The application of the energy equation to centrifugal pumps is a fundamental principle in fluid dynamics and engineering. In this scenario, the energy equation is used to calculate the flow rate of a centrifugal pump responsible for transferring water between two reservoirs at different elevations. The pump applies an energy input of 7500 joules per second, and the vertical difference between the lower and upper reservoirs is 10 meters. Additionally, the head loss due to friction and other...
Design Example: Design of an Irrigation Channel01:27

Design Example: Design of an Irrigation Channel

Trapezoidal channels are widely used in irrigation systems due to their cost-effectiveness and efficiency in conveying water. Trapezoidal channels feature a flat bottom and sloping sides, making them stable and easier to construct compared to other shapes. The bottom width and side slope ratio are determined based on the required flow capacity and site conditions. The side slope is kept gentle for unlined channels to prevent soil erosion.Hydraulic parameters in channel design include the flow...
Mixing Time01:19

Mixing Time

The concept of mixing time is significant in producing a uniform concrete mix with the required strength. The mixing period starts once all components are in the mixer. Initially, the mixer is charged with 10% of the water, followed by the consistent addition of solids and then 80% of the water. The remaining water is added later, within the first quarter of the mixing period. The minimum mixing time varies according to the mixer's capacity; for example, mixers with up to 1 cubic yard capacity...
Hydraulic Jump: Problem Solving01:16

Hydraulic Jump: Problem Solving

To analyze a hydraulic jump in a rectangular channel with a flow speed of 6 meters per second, follow these steps:Calculate Effective Upstream Velocity:When the downstream gate closes, a hydraulic jump forms, traveling upstream at 2 meters per second. This wave speed combines with the initial channel flow velocity, creating an effective upstream velocity.Identify Flow Velocities Before and After the Hydraulic Jump:Upstream of the hydraulic jump, the effective flow velocity includes both the...
Testing Water Quality01:14

Testing Water Quality

When the quality of water for concrete preparation is uncertain, its impact on the setting time of cement and compressive strength of mortar is assessed by comparison with de-ionized or distilled water benchmarks. American Society for Testing and Materials (ASTM) C1602 requires the setting times to be within 90 minutes of the control, British Standard (BS) 3146:1980 allows a 30-minute variance in the initial setting, while British Standards European Norm (BS EN) 1008 specifies initial setting...