DOTS in China - removing barriers or moving barriers?

B Xu1, H J Dong, Q Zhao

  • 1Department of Epidemiology, School of Public Health, Fudan University, Shanghai, China. bxu@shmu.edu.cn

Summary

China's National TB Control Programme (NTP) aimed to reduce patient costs. However, subsidies shifted expenses to before diagnosis, increasing delays and economic burdens for tuberculosis patients.

Related Concept Videos

Block Diagram Reduction01:22

Block Diagram Reduction

The process of deriving the transfer function of a control system often involves reducing its block diagram to a single block. This simplification can be achieved through a series of strategic operations, including relocating branch points and comparators. These operations preserve the overall function of the system while allowing for easier manipulation and combination of blocks.
The first step in this process is the identification and relocation of a branch point. A branch point, where a...
Schottky Barrier Diode01:27

Schottky Barrier Diode

Schottky barrier diodes are specialized semiconductor devices characterized by their unique construction. This construction involves combining a metal layer with a moderately doped n-type semiconductor material. This combination leads to the formation of a Schottky barrier, a pivotal element that defines the diode's operational characteristics. The core functionality of Schottky barrier diodes is their capacity to allow current to flow in only one direction due to their distinctive...
Design Example: Measuring Distance Between Two Points with Obstructions01:10

Design Example: Measuring Distance Between Two Points with Obstructions

When measuring distances in areas with physical obstructions, such as a lake in a field, surveyors must employ techniques to calculate accurate lengths without direct line measurements. One effective method is the offset technique, which allows for precise distance estimation over inaccessible stretches.In this scenario, a surveyor must measure a side of an area that crosses a lake. Since the measuring tape cannot span the lake, the surveyor begins by establishing a baseline that aligns with...
Design Example: Alignment of a Road Line Using GIS01:17

Design Example: Alignment of a Road Line Using GIS

The alignment of a road line using Geographic Information Systems (GIS) is a critical process in civil engineering, combining advanced technology with practical decision-making. This methodology begins with the collection of geospatial data, including information on land cover, geomorphology, drainage patterns, slope, and contour details. Such data is typically acquired through satellite imagery and GIS tools, offering a comprehensive understanding of the terrain.Once the data is gathered, it...