Implementing MOE/MAR: balancing project management with change management.
Stephanie Saull-McCaig1, RoseAnn Pacheco, Pakizah Kozak
1AcuteCare Information Management, Shared Information Management Services, University Health Network. Stephanie.Saull-Mccaig@uhn.on.ca
Healthcare Quarterly (Toronto, Ont.)
|December 14, 2006
Summary
University Health Network launched a large-scale Medication Order Entry/Medication Administration Record system implementation in 2001. This project required extensive change management, clinical engagement, and robust project oversight.
Area of Science:
- Health Informatics
- Clinical Information Systems
- Healthcare Management
Background:
- The University Health Network initiated a significant digital transformation project in 2001.
- The project involved implementing a new Medication Order Entry/Medication Administration Record system.
Purpose of the Study:
- To outline the foundational requirements for a large-scale health informatics initiative.
- To highlight the critical success factors for implementing electronic health records.
Main Methods:
- This initiative required comprehensive project management strategies.
- Significant clinical stakeholder involvement was essential for success.
- A robust change management program was developed and implemented.
Main Results:
- The project was recognized as one of the largest change management undertakings.
- Successful implementation depended on rigorous planning and execution.
Conclusions:
- Large-scale health IT projects necessitate meticulous planning and execution.
- Effective change management and clinical integration are paramount for successful system adoption.
Related Concept Videos
Methods of Documentation II: POMR
The Problem-Oriented Medical Record (POMR) revolutionized medical record-keeping by introducing a systematic approach focusing on the patient's problems rather than merely listing symptoms. Dr. Lawrence Weed's introduction of this method in the 1960s marked a significant advancement in medical documentation. The POMR framework consists of four key components: the database, problem list, plan of care, and progress notes.
Scale-Up Processes
The scale-up of microbial fermentation processes is essential in industrial biotechnology, allowing the transition from laboratory-scale experiments to commercial-scale production while aiming to maintain product yield and quality. This process requires meticulous adjustment of equipment design, process parameters, and contamination control strategies to accommodate increasing culture volumes.At the laboratory scale, cultures are typically maintained in 1 to 10-liter glass or autoclavable...
Stress Prevention and Stress Management Techniques VI
Adopting a healthier lifestyle often requires overcoming significant challenges, but leveraging psychological, social, and cultural resources can facilitate meaningful change. Effective self-change hinges on understanding and applying key tools such as motivation and goal setting, which help sustain efforts toward long-term health benefits.
Motivation and Self-Determination
Motivation, the driving force behind behavior, plays a pivotal role at every stage of the change process. The research...
Motivation and Self-Determination
Motivation, the driving force behind behavior, plays a pivotal role at every stage of the change process. The research...
Distributed Loads: Problem Solving
Beams are structural elements commonly employed in engineering applications requiring different load-carrying capacities. The first step in analyzing a beam under a distributed load is to simplify the problem by dividing the load into smaller regions, which allows one to consider each region separately and calculate the magnitude of the equivalent resultant load acting on each portion of the beam. The magnitude of the equivalent resultant load for each region can be determined by calculating...
Design Example: Managing Concrete Workability
This example deals with managing the workability of concrete for a raft foundation project under hot weather conditions. Workability is crucial for ensuring the concrete is easy to place, compact, and finish. In this scenario, a slump test — a common method to measure the workability of fresh concrete — initially indicated low workability. This was attributed to the rapid water loss from the concrete mix, exacerbated by the high temperatures causing the course aggregates to heat up.
To address...
To address...
Methods of Documentation VI: Case Management Model
The case management model is a multidisciplinary approach that involves healthcare professionals from diverse disciplines, such as physicians, nurses, therapists, social workers, and pharmacists, working collaboratively to address the various needs of patients. Each healthcare professional brings unique expertise and perspectives, contributing to a more comprehensive understanding of the patient's condition and tailoring treatment plans accordingly.
For example, a patient with a chronic illness...
For example, a patient with a chronic illness...

