Related Experiment Video
Updated: Jul 16, 2026

Interactive and Visualized Online Experimentation System for Engineering Education and Research
Published on: November 24, 2021
Activated sludge process control--development of operational diagrams
1Department of Civil Engineering, Government College of Technology, Coimbatore, Tamilnadu, 641 013, India. madhavan_jayanthi@rediffmail.com
Abstract:
Hindered batch settling experiments were performed on activated sludge generated from dairy wastewater and combined (Dairy-Domestic mixture 1:3) wastewater for different initial Mixed Liquor Suspended Solids (MLSS) concentrations from 2g/L to 20 g/L for varied Mean Cell Residence Time (MCRT) for 5 to 15 days. Bio kinetic coefficients of combined wastewater were determined using a bench scale Continues Flow Stirred Tank Reactor (CFSTR). Vesilind parameters were also determined experimentally. Operational diagrams for long-term fluctuations in plant inflow and substrate concentration have been prepared. The allowable overflow rate to prevent process failure can be predicted from the chart. The adjustments to be made in recycling ratio and MCRT in case of fluctuations could also be predicted from the operational diagrams. From the operating diagrams plotted for both dairy and combined wastewater, it was noticed that, combined wastewater treatment provide greater operational flexibility than treating dairy waste separately.
Related Concept Videos
Bioreactor Controls-I
Bioreactor Design and Operational System
Bioreactor Controls-II
Biological Treatment of Effluent and Waste Water
Elements of Block Diagrams
A block diagram typically includes essential elements such as comparators, blocks, and feedback loops. Each of these elements...
Block Diagram Reduction
The first step in this process is the identification and relocation of a branch point. A branch point, where a...

