Related Experiment Video
Updated: Jul 15, 2026

Basic Methods for the Study of Reproductive Ecology of Fish in Aquaria
Published on: July 20, 2017
Effects of resource level and habitat type on behavioral and morphological plasticity in Eurasian perch
Jens Olsson1, Richard Svanbäck, Peter Eklöv
1Limnology/Department of Ecology and Evolution, Evolutionary Biology Centre, Uppsala University, Norbyv. 20, 752 36 Uppsala, Sweden. Jens.Olsson@ebc.uu.se
Abstract:
Spatial and temporal heterogeneity in the environment is a common feature affecting many natural populations. For example, both the resource levels and optimal habitat choices of individuals likely change over time. One way for organisms to cope with environmental variation is to display adaptive plasticity in traits such as behavior and morphology. Since trait plasticity is hypothesized to be a prerequisite for character divergence, studies of mechanisms behind such plasticity are warranted. In this study, we looked at the interaction of two potentially important environmental variables on behavioral and morphological plasticity in Eurasian perch (Perca fluviatilis L.). More specifically, the plastic responses in activity and morphology of perch exposed to different resource levels and simulated habitat types were studied in an aquarium experiment. The resource level experienced had a large influence on plasticity in both activity and morphology. Behavioral adaptations have been thought to mediate morphological transitions, and we suggest that the morphological response to the resource level was mediated by differences in activity and growth rates. The habitat type also affected morphological plasticity but to a lesser extent, and there was no effect on activity from habitat type. Based on these results, we suggest that it is essential to include several environmental factors acting in concert when studying mechanisms behind trait plasticity. We also propose that variation in resource levels might play a key role in fostering trait plasticity in at least fish populations, while other environmental variables such as divergent habitat complexities and prey types might be less influential. Dynamics in resource levels and optimal habitat choices might thus be important factors influencing character divergence in natural populations.
More Related Videos
07:53Bioindication Testing of Stream Environment Suitability for Young Freshwater Pearl Mussels Using In Situ Exposure Methods
Published on: September 5, 2018
10:31A Proboscis Extension Response Protocol for Investigating Behavioral Plasticity in Insects: Application to Basic, Biomedical, and Agricultural Research
Published on: September 8, 2014
Related Concept Videos
Types of Selection
Fixed Action Patterns