Total building commissioning

Health Estate
|June 7, 2007
PubMed

Related Concept Videos

Insulation Coordination01:23

Insulation Coordination

Insulation coordination is the process of matching electric equipment's insulation strength with protective device characteristics to protect the equipment against expected overvoltages. This selection is based on engineering judgment and cost. Equipment can generally withstand short-duration high transient overvoltages, but repeated tests with identical waveforms can yield inconsistent results. As a result, standard impulse voltage waveforms are used for testing, defined by specific times for...
Types of Building Separation Joints01:23

Types of Building Separation Joints

Building separation joints divide large or complex building structures into smaller, discrete units that can move independently. These joints are categorized into three types: volume-change joints, settlement joints, and seismic separation joints.
Volume-change joints address the effects of expansion and contraction due to temperature and moisture variations. They are strategically placed at discontinuities in a building's mass where cracking is most likely and are spaced about 150 to 200 feet...
Methods of Documentation V: CBE01:23

Methods of Documentation V: CBE

Charting by Exception, or CBE, is a method of documentation used in healthcare, particularly in nursing, that focuses on documenting only significant or abnormal findings rather than recording every detail. This approach aims to streamline the documentation process, improve efficiency, and ensure that healthcare providers can quickly identify deviations from normalcy in patient assessments.
In CBE, healthcare professionals establish predefined standards of practice that define what constitutes...
Composite Masonry Walls01:18

Composite Masonry Walls

Composite masonry walls combine multiple wythes of the same or different masonry materials to create a unified structure. These walls feature wythes that are bonded together either through mortar-filled collar joints, grouted spaces, or more commonly, with rigid metal ties and reinforcements, with the use of masonry header units being rare. Metal ties are preferred because they effectively minimize water penetration, as these walls primarily absorb moisture and then release it into the...
Compacting Factor test01:22

Compacting Factor test

The compacting factor test is a method used to assess the workability of concrete. It is  especially suitable for concrete mixes containing aggregates up to one and a half inches in size. This test involves specialized equipment consisting of two truncated cone-shaped hoppers and a cylinder, all with polished interior surfaces to minimize friction.
The procedure begins by placing concrete into the upper hopper without any compaction. Once filled, the bottom door of this hopper is opened,...
Mass Concreting01:22

Mass Concreting

Mass concreting refers to the process of placing large volumes of concrete, such as in gravity dams. The heat generated during the cement hydration process and differential cooling rates within the concrete mass can lead to a temperature gradient, which can result in thermal cracks in the concrete mass.
To reduce the risk of such cracking, the concrete mix may incorporate low-heat cement and pozzolans to reduce the temperature rise. Pre-cooled angular aggregates and water-reducing admixtures...