Related Experiment Video
Updated: Jul 12, 2026

Watershed Planning within a Quantitative Scenario Analysis Framework
Published on: July 24, 2016
Evaluating success criteria and project monitoring in river enhancement within an adaptive management framework
T Kevin O'Donnell1, David L Galat
1Department of Fish and Wildlife Sciences, University of Missouri-Columbia, 302 ABNR Building, Columbia, MO 65211, USA. tkot24@mizzou.edu
Abstract:
Objective setting, performance measures, and accountability are important components of an adaptive-management approach to river-enhancement programs. Few lessons learned by river-enhancement practitioners in the United States have been documented and disseminated relative to the number of projects implemented. We conducted scripted telephone surveys with river-enhancement project managers and practitioners within the Upper Mississippi River Basin (UMRB) to determine the extent of setting project success criteria, monitoring, evaluation of monitoring data, and data dissemination. Investigation of these elements enabled a determination of those that inhibited adaptive management. Seventy river enhancement projects were surveyed. Only 34% of projects surveyed incorporated a quantified measure of project success. Managers most often relied on geophysical attributes of rivers when setting project success criteria, followed by biological communities. Ninety-one percent of projects that performed monitoring included biologic variables, but the lack of data collection before and after project completion and lack of field-based reference or control sites will make future assessments of ecologic success difficult. Twenty percent of projects that performed monitoring evaluated >or=1 variable but did not disseminate their evaluations outside their organization. Results suggest greater incentives may be required to advance the science of river enhancement. Future river-enhancement programs within the UMRB and elsewhere can increase knowledge gained from individual projects by offering better guidance on setting success criteria before project initiation and evaluation through established monitoring protocols.
Related Concept Videos
Design Example: Analyzing Capacity Contours for Flood Risk Assessment
Typical Model Studies
Quality of Water
Design Example: Maintaining Level of an Embankment
Chronic Kidney Disease IV: Nursing Management
Net Change Theorem