Related Experiment Video
Updated: Jul 12, 2026

Mesocosm-Scale Constructed Wetland Design for Wastewater Treatment
Published on: May 2, 2025
Abstract:
In-place bitumen resources in the Alberta oil sands are estimated at 1350 billion barrels. Open-pit mining and hot water extraction methods, which involve the handling of huge tonnages of earth materials, are being employed in the two commercial plants now operating. In situ recovery methods will be required to tap the 90 percent of reserves that are too deeply buried to be surface mined. Development of in situ technologies will be painstaking and expensive, and success will hinge on their compatibility with extremely complex geological conditions in the subsurface.
Related Concept Videos
Green Algae
Porosity and Absorption of Aggregate
When all pores in an aggregate are filled with water, the aggregate is considered saturated and surface-dry. If left in dry air, water will evaporate until the aggregate...
Microbial Bioremediation of Hydrocarbons
Acid Mine Drainage
Physical Properties of Alkanes
Specific Gravity of Aggregate
Bulk or gross specific gravity is calculated by taking the ratio of the mass of aggregates in the saturated surface-dry state to the total volume that includes both the solids and the voids within the...

