Jove
Visualize
Contact Us
JoVE
x logofacebook logolinkedin logoyoutube logo
ABOUT JoVE
OverviewLeadershipBlogJoVE Help Center
AUTHORS
Publishing ProcessEditorial BoardScope & PoliciesPeer ReviewFAQSubmit
LIBRARIANS
TestimonialsSubscriptionsAccessResourcesLibrary Advisory BoardFAQ
RESEARCH
JoVE JournalMethods CollectionsJoVE Encyclopedia of ExperimentsArchive
EDUCATION
JoVE CoreJoVE BusinessJoVE Science EducationJoVE Lab ManualFaculty Resource CenterFaculty Site
Terms & Conditions of Use
Privacy Policy
Policies

Related Concept Videos

Common Leveling Mistakes and Errors01:17

Common Leveling Mistakes and Errors

A survey team is tasked with determining the elevation difference between points Point A and Point B, separated by uneven terrain. They use a leveling instrument and a leveling rod.Common MistakesMisreading the Rod: During a backsight reading at Point A, the instrumentman observes the rod partially obscured by tall grass. Instead of reading 1.135 m, they mistakenly record 1.735 m due to the misalignment of the crosshair with the wrong graduation. This error adds 0.600 m to all subsequent...
Differential Leveling01:12

Differential Leveling

Differential leveling is a precise method in surveying used to determine the elevation difference between two points. Its primary goal is to establish accurate vertical measurements to create level surfaces or grade lines critical for designing and constructing infrastructures such as roads, bridges, and buildings.The procedure for differential leveling begins with setting up and leveling the instrument at a point where the benchmark can be seen. The level rod is held on the benchmark (BM), and...
Distance Corrections01:15

Distance Corrections

To achieve precise distance measurements, especially in surveying and construction, certain corrections must be applied to account for potential sources of error like the standardization errors, temperature variations, and slope adjustments.Standardization error emerges when measurement equipment undergoes changes, such as wear, repairs, or weather impacts. To address this, surveyors compare the equipment’s readings to a standard. This process identifies any deviation that might lead to...
Design Example: Measuring Distance Between Two Points with Obstructions01:10

Design Example: Measuring Distance Between Two Points with Obstructions

When measuring distances in areas with physical obstructions, such as a lake in a field, surveyors must employ techniques to calculate accurate lengths without direct line measurements. One effective method is the offset technique, which allows for precise distance estimation over inaccessible stretches.In this scenario, a surveyor must measure a side of an area that crosses a lake. Since the measuring tape cannot span the lake, the surveyor begins by establishing a baseline that aligns with...
Design Example: Maintaining Level of an Embankment01:19

Design Example: Maintaining Level of an Embankment

Constructing a roadway embankment over uneven terrain requires precise leveling to ensure stability and proper drainage. Surveyors use a leveling instrument and staff to calculate ground elevations and determine the required fill material at each point along the embankment alignment.The process begins by positioning a leveling instrument near a benchmark with a known elevation. A backsight reading establishes the instrument height, which serves as a reference for subsequent measurements. A...
Adjusting a Traverse01:12

Adjusting a Traverse

In the site survey of a four-sided traverse, internal angles are essential to ensure geometric accuracy. The survey revealed that the sum of the measured internal angles was 359 degrees and 48 minutes, which is 12 minutes less than the expected 360 degrees. This discrepancy signals an error likely arising from measurement inaccuracies during the fieldwork.To rectify this error, the adjustment process involved distributing the 12-minute shortfall equally across the four internal angles. By...

You might also read

Related Articles

Articles linked to this work by shared authors, journal, and citation graph.

Sort by
Same author

Physical activity for small- and medium-sized enterprises: what features work in real life? A Delphi study.

European journal of public health·2026
Same author

Impact of Tibetan Ancestry on Respiratory Control and Central Sleep Apnea in Hypoxia.

Journal of sleep research·2026
Same author

Altitude-induced periodic breathing optimises respiratory efficiency during sleep in young healthy males.

Thorax·2026
Same author

Movement patterns of youth and their parents: cross-sectional and longitudinal associations.

Journal of activity, sedentary and sleep behaviors·2026
Same author

AltitudeOmics: Breathing variability at rest and during exercise across 16 days of acclimatization to hypobaric hypoxia.

The Journal of physiology·2025
Same author

The role of acid-base balance in cerebrovascular and ventilatory responses to CO<sub>2</sub> during 10 h normobaric hypoxia.

The Journal of physiology·2025

Related Experiment Video

Updated: Jul 11, 2026

Measuring Psoriasis Severity at Home
02:28

Measuring Psoriasis Severity at Home

Published on: March 1, 2024

Measuring mountain maladies

Robert Roach, Bengt Kayser

    High Altitude Medicine & Biology
    |September 11, 2007
    PubMed
    Summary

    No abstract available in PubMed .

    More Related Videos

    Laboratory and Field Protocol for Estimating Sheet Erosion Rates from Dendrogeomorphology
    07:20

    Laboratory and Field Protocol for Estimating Sheet Erosion Rates from Dendrogeomorphology

    Published on: January 7, 2019

    The 4 Mountains Test: A Short Test of Spatial Memory with High Sensitivity for the Diagnosis of Pre-dementia Alzheimer's Disease
    06:23

    The 4 Mountains Test: A Short Test of Spatial Memory with High Sensitivity for the Diagnosis of Pre-dementia Alzheimer's Disease

    Published on: October 13, 2016

    Related Experiment Videos

    Last Updated: Jul 11, 2026

    Measuring Psoriasis Severity at Home
    02:28

    Measuring Psoriasis Severity at Home

    Published on: March 1, 2024

    Laboratory and Field Protocol for Estimating Sheet Erosion Rates from Dendrogeomorphology
    07:20

    Laboratory and Field Protocol for Estimating Sheet Erosion Rates from Dendrogeomorphology

    Published on: January 7, 2019

    The 4 Mountains Test: A Short Test of Spatial Memory with High Sensitivity for the Diagnosis of Pre-dementia Alzheimer's Disease
    06:23

    The 4 Mountains Test: A Short Test of Spatial Memory with High Sensitivity for the Diagnosis of Pre-dementia Alzheimer's Disease

    Published on: October 13, 2016