Native plant diversity resists invasion at both low and high resource levels

John Maron1, Marilyn Marler

  • 1Division of Biological Sciences, University of Montana, Missoula, Montana 59812, USA. john.maron@mso.umt.edu

Ecology
|November 22, 2007
PubMed

Related Concept Videos

Ecological Niches02:02

Ecological Niches

All organisms have a position within an ecosystem. The complete set of living and nonliving factors—including food resources, climate, and terrain—that define the position of a given organism are collectively referred to as the organism’s ecological niche.Multiple species cannot occupy the exact same niche within their habitat. If the niches of two or more species overlap to a large extent, the competitive exclusion principle dictates that one species will outcompete the other, forcing it to...
Ecological Succession02:17

Ecological Succession

Ecological succession is influenced by the processes of facilitation, inhibition, and toleration. Facilitation occurs when early successional species create more favorable ecological conditions for subsequent species, such as enhanced nutrient, water, or light availability. In contrast, inhibition happens when early successional species create unfavorable ecological conditions for potential successive species, such as limiting resource availability. In some cases, later successional species...
Competition02:34

Competition

When organisms require the same limited resources within an environment, they may have to compete for them. Competition is a net-negative interaction. Even if two competing individuals or populations do not interact directly, the overall fitness of both competitors is lowered as a result of not having full access to the limited resource.Intraspecific competition, which occurs between individuals of the same species, serves as a natural mechanism for regulating population size. Too much...
Introduction to Plant Diversity02:22

Introduction to Plant Diversity

From Water to Land
Epiphytes, Parasites, and Carnivores02:40

Epiphytes, Parasites, and Carnivores

Plants often form mutualistic relationships with soil-dwelling fungi or bacteria to enhance their roots’ nutrient uptake ability. Root-colonizing fungi (e.g., mycorrhizae) increase a plant’s root surface area, which promotes nutrient absorption. While root-colonizing, nitrogen-fixing bacteria (e.g., rhizobia) convert atmospheric nitrogen (N2) into ammonia (NH3), making nitrogen available to plants for various biological functions. For example, nitrogen is essential for the biosynthesis of the...
Defenses Against Pathogens and Herbivores02:26

Defenses Against Pathogens and Herbivores

Plants present a rich source of nutrients for many organisms, making it a target for herbivores and infectious agents. Plants, though lacking a proper immune system, have developed an array of constitutive and inducible defenses to fend off these attacks.