Transient simulations of nitrogen load for a coastal aquifer and embayment, Cape Cod, MA

John A Colman1, John P Masterson

  • 1United States Geological Survey, 10 Bearfoot Road, Northborough, Massachusetts 01532, USA. jacolman@usgs.gov

Related Concept Videos

Porosity and Absorption of Aggregate01:20

Porosity and Absorption of Aggregate

Aggregates contain pores of varying sizes; while some are completely enclosed within the particles, others open onto the surface, allowing water to penetrate. The porosity of aggregates is a major factor contributing to the overall porosity of concrete, given that aggregates constitute about three-quarters of concrete's volume.
When all pores in an aggregate are filled with water, the aggregate is considered saturated and surface-dry. If left in dry air, water will evaporate until the aggregate...
Electrostatic Boundary Conditions01:16

Electrostatic Boundary Conditions

Consider an external electric field propagating through a homogeneous medium. When the electric field crosses the surface boundary of the medium, it undergoes a discontinuity. The electric field can be resolved into normal and tangential components. The amount by which the field changes at any boundary is given by the difference between the field components above and below the surface boundary.
The surface integral of an electric field is given by Gauss's law in integral form and is related to...
Magnetostatic Boundary Conditions01:28

Magnetostatic Boundary Conditions

An electric field suffers a discontinuity at a surface charge. Similarly, a magnetic field is discontinuous at a surface current. The perpendicular component of a magnetic field is continuous across the interface of two magnetic mediums. In contrast, its parallel component, perpendicular to the current, is discontinuous by the amount equal to the product of the vacuum permeability and the surface current. Like the scalar potential in electrostatics, the vector potential is also continuous...
Transient and Steady-state Response01:24

Transient and Steady-state Response

In control systems, test signals are essential for evaluating performance under various conditions. The ramp function is effective for systems undergoing gradual changes, while the step function is suitable for assessing systems facing sudden disturbances. For systems subjected to shock inputs, the impulse function is the most appropriate test signal.
These test signals are integral in designing control systems to exhibit two key performance aspects: transient response and steady-state response.
Testing Water Quality01:14

Testing Water Quality

When the quality of water for concrete preparation is uncertain, its impact on the setting time of cement and compressive strength of mortar is assessed by comparison with de-ionized or distilled water benchmarks. American Society for Testing and Materials (ASTM) C1602 requires the setting times to be within 90 minutes of the control, British Standard (BS) 3146:1980 allows a 30-minute variance in the initial setting, while British Standards European Norm (BS EN) 1008 specifies initial setting...
Net Change Theorem01:22

Net Change Theorem

The Net Change Theorem is a fundamental principle in calculus that establishes a direct relationship between a function’s rate of change and its accumulated change over an interval. Mathematically, it states that the definite integral of a function's derivative over a given interval [a,b] yields the net change in the original function:This theorem has significant applications in various real-world scenarios, including physics, economics, and engineering. A particularly useful application is in...