Kisspeptin and KISS1R: a critical pathway in the reproductive system

Elena Gianetti1, Stephanie Seminara

  • 1Reproductive Endocrine Unit, Massachusetts General Hospital, 55 Fruit Street, BHX 5, Boston, Massachusetts 02114, USA. egianetti@partners.org

Reproduction (Cambridge, England)
|June 3, 2008
PubMed

Related Concept Videos

Interactions Between Signaling Pathways01:19

Interactions Between Signaling Pathways

Signaling cascades usually lack linearity. Multiple pathways interact and regulate one another, allowing cells to integrate and respond to diverse environmental stimuli.
Convergence and divergence, and cross-talk between signaling pathways
Two distinct signaling pathways can converge on a single functional unit, which may either be a single protein or a complex of proteins. The response is either functionally distinct or synergistic between the two pathways but different from the response...
Notch Signaling Pathway03:14

Notch Signaling Pathway

The Notch signaling pathway is a major intracellular signaling pathway that is highly conserved over a broad spectrum of metazoan species. It stands unique from other intracellular signaling mechanisms in animals because notch protein itself acts as the receptor as well as the primary signaling molecule.
The Notch gene came into the limelight in 1914 after the discovery that its mutation in Drosophila melanogaster leads to a serrated (or "notched") wing margin phenotype. It was not until 1985...
Notch Signaling Pathway03:14

Notch Signaling Pathway

The Notch signaling pathway is a major intracellular signaling pathway that is highly conserved over a broad spectrum of metazoan species. It stands unique from other intracellular signaling mechanisms in animals because notch protein itself acts as the receptor as well as the primary signaling molecule.
The Notch gene came into the limelight in 1914 after the discovery that its mutation in Drosophila melanogaster leads to a serrated (or "notched") wing margin phenotype. It was not until 1985...
Yeast Signaling01:28

Yeast Signaling

Yeasts are single-celled organisms, but unlike bacteria, they are eukaryotes (cells with a nucleus). Cell signaling in yeast is similar to signaling in other eukaryotic cells. A ligand, such as a protein or a small molecule released from a yeast cell, attaches to a receptor on the cell surface. The binding stimulates second-messenger kinases to activate or inactivate transcription factors that further regulate gene expression. Many of the yeast intracellular signaling cascades have similar...
Hedgehog Signaling Pathway02:33

Hedgehog Signaling Pathway

The Hedgehog gene (Hh) was first discovered due to its control of the growth of disorganized, hair-like bristles phenotype in Drosophila, much like hedgehog spines. Hh plays a crucial role in the development of organs and the maintenance of homeostasis in both invertebrates and vertebrates. However, while Drosophila has only one Hh protein, mammals have multiple functional Hedgehog proteins - Sonic (Shh), Desert (Dhh), and Indian Hedgehog (Ihh). All of these homologous proteins have adapted to...
Hedgehog Signaling Pathway02:33

Hedgehog Signaling Pathway

The Hedgehog gene (Hh) was first discovered due to its control of the growth of disorganized, hair-like bristles phenotype in Drosophila, much like hedgehog spines. Hh plays a crucial role in the development of organs and the maintenance of homeostasis in both invertebrates and vertebrates. However, while Drosophila has only one Hh protein, mammals have multiple functional Hedgehog proteins - Sonic (Shh), Desert (Dhh), and Indian Hedgehog (Ihh). All of these homologous proteins have adapted to...