Related Experiment Video
Updated: Aug 19, 2026

Evaluation of a Novel Laser-assisted Coronary Anastomotic Connector - the Trinity Clip - in a Porcine Off-pump Bypass Model
Published on: November 24, 2014
Clinical evaluation of a critical path for coronary artery bypass surgery patients
Abstract:
The critical path, one component of the case management model, was examined to determine its accuracy in describing patient recovery following coronary artery bypass surgery and to determine if variations from the path influenced postoperative length of stay. One hundred ninety-five (195) postoperative days were analyzed on 28 subjects. Data about patient characteristics, daily progress, and recovery following transfer from intensive care until hospital discharge were compared to expected patient progress and recovery as delineated by the critical path. Fifty-seven percent (57%) of the patients (n = 28) were discharged within the time frames designated by the critical path. Significant correlations (p less than or equal to .01) were found between postoperative length of stay and the variables of activity progression (r = -.46), telemetry usage (r = -.56), inspirometer use (r = -.35), and adherence to the critical path (r = -.48). Using step-wise multiple regression analysis, overall adherence to the critical path in the areas of telemetry usage and activity progression were found to be significant predictors of postoperative length of stay (combined R2 = .65).
More Related Videos
07:25Predicting Amputation using Local Circulating Mononuclear Progenitor Cells in Angioplasty-treated Patients with Critical Limb Ischemia
Published on: September 22, 2020
05:25Surgical Porcine Model of Chronic Myocardial Ischemia Treated by Exosome-laden Collagen Patch and Off-pump Coronary Artery Bypass Graft
Published on: September 15, 2023
Related Concept Videos
Cardiac Catheterization I: Pre-Procedure Overview
Coronary Artery Disease V: Interprofessional Care
Acute Coronary Syndrome III: Diagnostic Studies
Acute Coronary Syndrome IV: Interprofessional Care
Peripheral Artery Disease III: Interprofessional Care
Peripheral Artery Disease V: Postoperative Nursing Management