Jove
Visualize
Contact Us

Related Concept Videos

Design Example: Aggregate Gradation01:24

Design Example: Aggregate Gradation

The right type and quality of aggregates are crucial for concrete as they significantly influence its properties, mix proportions, and cost-effectiveness. If different sources are available for sand, the commonly used fine aggregate in concrete, the selection of sand is primarily based on its gradation.
The grading, or particle-size distribution, of sand is determined using sieve analysis, with standard sizes ranging from 150 μm to 10 mm (ASTM No. 100 sieve to 3⁄8 in. sieve). Sand is sampled...
Wood Panel Products01:18

Wood Panel Products

Wood panel products are essential materials used in construction for applications such as flooring, siding, and roofing, typically available in standard dimensions of 4 feet by 8 feet, with thicknesses varying from one-quarter of an inch to one and one-eighth inches. Among the most common types of wood panels is plywood, which is produced by gluing multiple layers of thin wood veneers under pressure. The grain of the outer veneers runs lengthwise, while the grains of the interior layers run...
Design Example: Managing Concrete Workability01:14

Design Example: Managing Concrete Workability

This example deals with managing the workability of concrete for a raft foundation project under hot weather conditions. Workability is crucial for ensuring the concrete is easy to place, compact, and finish. In this scenario, a slump test — a common method to measure the workability of fresh concrete — initially indicated low workability. This was attributed to the rapid water loss from the concrete mix, exacerbated by the high temperatures causing the course aggregates to heat up.
To address...
Design Example: Designing Water Slide01:18

Design Example: Designing Water Slide

When designing a water slide, controlling the speed of water flow is crucial for rider safety while maintaining an exciting experience. As water flows down the slide, gravity causes it to accelerate, with its speed at the bottom depending on the height from which it starts. The higher the slide, the more potential energy the water has at the top, which is converted into kinetic energy as it descends, increasing its speed.
Bernoulli's principle determines the water's velocity along the slide.
Design Consideration01:22

Design Consideration

Designing a structure involves a series of considerations, primarily the material's ultimate strength, calculated through tests that measure changes under increased force until the material reaches its breaking point or limit. The ultimate load, where the material breaks, is divided by its original cross-sectional area, resulting in the ultimate normal stress or strength. The ultimate shearing stress is another significant factor taken into account.
The factor of safety is another key aspect...
Finishing Concrete01:18

Finishing Concrete

Concrete finishing starts immediately after the concrete has been placed and consolidated. The initial step, screeding, involves leveling the concrete surface by removing excess material to flush it with the formwork's top. Following this, bull float or darby are employed to smooth the surface further, effectively lower high spots, fill low areas, and ensure larger aggregate particles are embedded within the concrete. This preparation is critical before the appearance of bleed water, as its...

You might also read

Related Articles

Articles linked to this work by shared authors, journal, and citation graph.

Sort by
Same author

'World-class'. Raising the bar with patient- and family-centered design elements.

Health facilities management·2013
See all related articles
JoVE
x logofacebook logolinkedin logoyoutube logo
ABOUT JoVE
OverviewLeadershipBlogJoVE Help Center
AUTHORS
Publishing ProcessEditorial BoardScope & PoliciesPeer ReviewFAQSubmit
LIBRARIANS
TestimonialsSubscriptionsAccessResourcesLibrary Advisory BoardFAQ
RESEARCH
JoVE JournalMethods CollectionsJoVE Encyclopedia of ExperimentsArchive
EDUCATION
JoVE CoreJoVE BusinessJoVE Science EducationJoVE Lab ManualFaculty Resource CenterFaculty Site
Terms & Conditions of Use
Privacy Policy
Policies

Related Experiment Video

Updated: Jul 2, 2026

Application of Design Aspects in Uniaxial Loading Machine Development
05:23

Application of Design Aspects in Uniaxial Loading Machine Development

Published on: September 19, 2018

Floor show. Selecting the right product for the application

Barbara A Dellinger1

  • 1HDR, Alexandria, VA, USA. barbara.dellinger@hdrinc.com

Health Facilities Management
|August 30, 2008
PubMed
Summary

No abstract available in PubMed .

More Related Videos

Reduced-gravity Environment Hardware Demonstrations of a Prototype Miniaturized Flow Cytometer and Companion Microfluidic Mixing Technology
13:59

Reduced-gravity Environment Hardware Demonstrations of a Prototype Miniaturized Flow Cytometer and Companion Microfluidic Mixing Technology

Published on: November 13, 2014

Design and Use of an Apparatus for Presenting Graspable Objects in 3D Workspace
09:11

Design and Use of an Apparatus for Presenting Graspable Objects in 3D Workspace

Published on: August 8, 2019

Related Experiment Videos

Last Updated: Jul 2, 2026

Application of Design Aspects in Uniaxial Loading Machine Development
05:23

Application of Design Aspects in Uniaxial Loading Machine Development

Published on: September 19, 2018

Reduced-gravity Environment Hardware Demonstrations of a Prototype Miniaturized Flow Cytometer and Companion Microfluidic Mixing Technology
13:59

Reduced-gravity Environment Hardware Demonstrations of a Prototype Miniaturized Flow Cytometer and Companion Microfluidic Mixing Technology

Published on: November 13, 2014

Design and Use of an Apparatus for Presenting Graspable Objects in 3D Workspace
09:11

Design and Use of an Apparatus for Presenting Graspable Objects in 3D Workspace

Published on: August 8, 2019