Intermittent child employment and its implications for estimates of child labour

Deborah Levison1, Jasper Hoek, David Lam

  • 1Humphrey Institute of Public Affairs,

International Labour Review
|September 26, 2008
PubMed

Related Concept Videos

Prediction Intervals01:03

Prediction Intervals

The interval estimate of any variable is known as the prediction interval. It helps decide if a point estimate is dependable.
However, the point estimate is most likely not the exact value of the population parameter, but close to it. After calculating point estimates, we construct interval estimates, called confidence intervals or prediction intervals. This prediction interval comprises a range of values unlike the point estimate and is a better predictor of the observed sample value, y. 
The...
Quantifying Work02:30

Quantifying Work

As a system undergoes a change, its internal energy can change, and energy can be transferred from the system to the surroundings, or from the surroundings to the system.
The Availability Heuristic01:08

The Availability Heuristic

A heuristic is a general problem-solving framework (Tversky & Kahneman, 1974). You can think of these as mental shortcuts that are used to solve problems. Different types of heuristics are used in different types of situations, and the impulse to use a heuristic occurs when one of five conditions is met (Pratkanis, 1989):
Introduction to Partial Derivatives01:25

Introduction to Partial Derivatives

In many real-world situations, an output depends on more than one input. In a high-tech assembly plant, total production may depend on technician labor and machine capacity at the same time. This relationship can be represented by a continuous function P(T, M), where T denotes technician labor input, and M denotes machine capacity. When demand increases, but the budget remains fixed, the manager must determine which input will improve production more efficiently.Partial derivatives provide a...