Related Experiment Video
Updated: Jun 27, 2026

Problem-Solving Before Instruction (PS-I): A Protocol for Assessment and Intervention in Students with Different Abilities
Published on: September 11, 2021
Using performance feedback to enhance implementation fidelity of the problem-solving team process
Matthew K Burns1, Rebecca Peters, George H Noell
1University of Minnesota, Minnesota, USA. burns258@umn.edu
Abstract:
Implementation integrity is a potentially critical issue for problem-solving teams (PST) and most response-to-intervention models. The current study hypothesized that providing performance feedback, which has consistently been shown to increase implementation integrity, to PSTs would enhance the procedural integrity of the process. The PSTs for three elementary schools were provided performance feedback with a 20-item checklist created from the literature. A multiple-baseline design across schools revealed an immediate change in level after providing performance feedback. The resulting percentages of non-overlapping data were 90.9%, 90.0%, and 100%. However, PSTs still did not monitor student progress, assess the effectiveness of the intervention, or measure the integrity with which the intervention was implemented even after receiving feedback. Thus, providing performance feedback could be a method to increase the fidelity with which critical components of data-based problem-solving are implemented, but these data suggest the need for additional research.
Related Concept Videos
Sources of Self-Esteem II: Performance Feedback
Effects of feedback
Feedback significantly modifies the gain of a control system. The gain of a system without feedback is altered by a factor of one plus GH, where G represents...
Negative and Positive Feedback
Introspection
Problem-Solving
Social Facilitation

