The risk management of third parties during construction in multifunctional urban locations

Shahid Suddle1

  • 1Faculty of Civil Engineering and Geosciences, Delft University of Technology, Delft, The Netherlands. s.i.suddle@sscm.nl

Related Concept Videos

Design Example: Analyzing Capacity Contours for Flood Risk Assessment01:17

Design Example: Analyzing Capacity Contours for Flood Risk Assessment

Flood risk assessment involves careful planning and analysis to ensure the safety of communities near water retention structures. Capacity contours are a vital tool in this process, as they illustrate the potential spread of water at specific levels in a given area. In the context of building a bund across a small valley, these contours play a critical role in evaluating the safety of nearby residential areas.In this example, the bund is intended to store stormwater in the valley. The engineers...
Design Example: Sustainability in Concrete Building01:26

Design Example: Sustainability in Concrete Building

As the construction industry moves towards more eco-friendly practices, concrete's adaptability and its ability to incorporate sustainable features make it a key material in the drive towards greener building solutions.
There are multiple approaches to achieve sustainability in a commercial concrete building. For instance, construct a concrete parking area under the building, utilizing pervious concrete paver blocks in open areas to facilitate rainwater collection through an underground cistern.
Types of Building Separation Joints01:23

Types of Building Separation Joints

Building separation joints divide large or complex building structures into smaller, discrete units that can move independently. These joints are categorized into three types: volume-change joints, settlement joints, and seismic separation joints.
Volume-change joints address the effects of expansion and contraction due to temperature and moisture variations. They are strategically placed at discontinuities in a building's mass where cracking is most likely and are spaced about 150 to 200 feet...
Movement Joints in Buildings01:27

Movement Joints in Buildings

Movement joints in buildings are essential design elements that accommodate inevitable motions caused by various factors such as temperature changes, moisture content variations, and structural deflections. These motions, if not considered in design and construction, can lead to unsightly or dangerous damage. Movement joints are incorporated in different forms to manage these stresses and allow materials to move without causing distress.
The simplest type of movement joints, working joints, are...
Reinforced Brick Masonry01:15

Reinforced Brick Masonry

Reinforced brick masonry is an advanced construction technique that enhances the structural integrity of brick walls by incorporating steel reinforcements. These reinforcements are either placed within the hollow cores of bricks or sandwiched between two layers of masonry, known as wythes, and are then secured in place with grout. Grout is a fluid mixture composed of Portland cement, aggregate, and water, providing the necessary bonding agent for the steel and brick.
To fortify brick walls...
Design Example: Alignment of a Road Line Using GIS01:17

Design Example: Alignment of a Road Line Using GIS

The alignment of a road line using Geographic Information Systems (GIS) is a critical process in civil engineering, combining advanced technology with practical decision-making. This methodology begins with the collection of geospatial data, including information on land cover, geomorphology, drainage patterns, slope, and contour details. Such data is typically acquired through satellite imagery and GIS tools, offering a comprehensive understanding of the terrain.Once the data is gathered, it...