Related Experiment Video
Updated: Jun 23, 2026

Comparison of Scale in a Photosynthetic Reactor System for Algal Remediation of Wastewater
Published on: March 6, 2017
Comparison of performance and operation of side-by-side integrated fixed-film and conventional activated sludge
Anne-Emmanuelle Stricker1, Ashley Barrie, Carol L A Maas
1Environment Canada, Water Science and Technology Directorate, Burlington, Ontario, Canada.
Abstract:
A full-scale demonstration of an integrated fixed-film activated sludge (IFFAS) process with floating carriers has been conducted in Ontario, Canada, since August 2003. In this study, data collected on-site from July 2005 to December 2006 are analyzed and compared with the performance of a conventional activated sludge train operated in parallel. Both trains received similar loadings and maintained comparable mixed liquor concentrations; however, the IFFAS had 50% more biomass when the attached growth was considered. In the winter, the conventional train operated at the critical solids retention time (SRT) and had fluctuating partial nitrification. The IFFAS nitrified more consistently and had a doubled average capacity. In the summer, the suspended SRT was less limiting, and the benefit of IFFAS for nitrification was marginal. The lessons learned from the operational requirements and challenges of the IFFAS process (air flow, carrier management, and seasonal foaming) are discussed, and design recommendations are proposed for whole plant retrofit.
More Related Videos
Related Concept Videos
Biological Treatment of Effluent and Waste Water
Scale-Up Processes
Microbial Wastewater Treatment
Bioreactor Design and Operational System
Bioreactor Controls-II
Bioreactor Controls-I

