The placement strategies of structural best management practices for different moving rainstorms

Chia-Ling Chang1, Te-Yueh Liou

  • 1Department of Water Resources Engineering and Conservation, Feng Chia University, No.100, Wenhwa Rd, Seatwen, Taichung, Taiwan, Republic of China. f89541201@ntu.edu.tw

Related Concept Videos

Conservation of Mass in Moving, Nondeforming Control Volume01:14

Conservation of Mass in Moving, Nondeforming Control Volume

Stormwater detention basins are essential in managing runoff during heavy rainfall, particularly in urban areas where impervious surfaces increase the risk of flooding. Understanding the conservation of mass in these systems allows engineers to optimize basin performance, balancing inflow, outflow, and water storage.
In the context of a detention basin, the conservation of mass states that the total mass of water entering the basin must equal the mass leaving the basin plus any accumulation of...
Placing Concrete01:17

Placing Concrete

The concrete is placed as close as possible to its final position to avoid segregation. The placed concrete is then fully compacted to expel the entrapped air, and the next layer of concrete is laid while the underlying layer is still in the plastic state. The rate at which concrete is placed and compacted is kept equal.
While placing concrete, care is taken to ensure that the concrete is laid in uniform layers, and hand shoveling and moving concrete using poker vibrators is avoided. Also,...
Design Example: Analyzing Capacity Contours for Flood Risk Assessment01:17

Design Example: Analyzing Capacity Contours for Flood Risk Assessment

Flood risk assessment involves careful planning and analysis to ensure the safety of communities near water retention structures. Capacity contours are a vital tool in this process, as they illustrate the potential spread of water at specific levels in a given area. In the context of building a bund across a small valley, these contours play a critical role in evaluating the safety of nearby residential areas.In this example, the bund is intended to store stormwater in the valley. The engineers...
Types of Building Separation Joints01:23

Types of Building Separation Joints

Building separation joints divide large or complex building structures into smaller, discrete units that can move independently. These joints are categorized into three types: volume-change joints, settlement joints, and seismic separation joints.
Volume-change joints address the effects of expansion and contraction due to temperature and moisture variations. They are strategically placed at discontinuities in a building's mass where cracking is most likely and are spaced about 150 to 200 feet...
Movement Joints in Buildings01:27

Movement Joints in Buildings

Movement joints in buildings are essential design elements that accommodate inevitable motions caused by various factors such as temperature changes, moisture content variations, and structural deflections. These motions, if not considered in design and construction, can lead to unsightly or dangerous damage. Movement joints are incorporated in different forms to manage these stresses and allow materials to move without causing distress.
The simplest type of movement joints, working joints, are...
Cavity Drainage and Flashings in Masonry walls01:20

Cavity Drainage and Flashings in Masonry walls

Typically, a cavity wall consists of two wythes separated by a gap of at least 2 inches, which may contain insulation while still maintaining a minimum clear space of 1 inch to facilitate adequate drainage. Advanced methods like the insertion of a continuous drainage mat can further reduce this space while ensuring effective moisture expulsion.
Weep holes, strategically placed at the base of the cavity, are critical for draining accumulated water. These openings are created by leaving head...