Advanced nitrogen removal via nitrite from municipal wastewater in a pilot-plant sequencing batch reactor
1Beijing University of Technology, 100124 Beijing, China. yangqing@emaisl.bjut.edu.cn
Abstract:
To obtain economically sustainable wastewater treatment, advanced nitrogen removal from municipal wastewater and the feasibility of achieving and stabilizing short-cut nitrification and denitrification were investigated in a pilot-plant sequencing batch reactor (SBR) with a working volume of 54 m(3). Advanced nitrogen removal, from summer to winter, with effluent TN lower than 3 mg/L and nitrogen removal efficiency above 98% was successfully achieved in pulsed-feed SBR. Through long-term application of process control in pulsed-feed SBR, nitrite accumulation reached above 95% at normal temperature of 25 degrees C. Even in winter, at the lowest temperature of 13 degrees C, nitrite was still the end production of nitrification and nitrite accumulation was higher than 90%. On the basis of achieving advanced nitrogen removal, short-cut nitrification and denitrification was also successfully achieved. Compare to the pulse-feed SBR with fixed time control, the dosage of carbon source and energy consumption in pulsed-feed SBR with process control were saved about 30% and 15% respectively. In pulsed-feed SBR with process control, nitrogen removal efficiency was greatly improved. Moreover, consumption of power and carbon source was further saved.
More Related Videos
Related Concept Videos
Microbial Wastewater Treatment
Microbes and the Nitrogen Cycle
Biological Treatment of Effluent and Waste Water
Overview of Nitrogen Metabolism
The largest pool of nitrogen available in the terrestrial ecosystem is gaseous nitrogen (N2) from the air, but this nitrogen...
Bioreactor Design and Operational System
Inorganic Nitrogen Assimilation