Jove
Visualize
Contact Us
JoVE
x logofacebook logolinkedin logoyoutube logo
ABOUT JoVE
OverviewLeadershipBlogJoVE Help Center
AUTHORS
Publishing ProcessEditorial BoardScope & PoliciesPeer ReviewFAQSubmit
LIBRARIANS
TestimonialsSubscriptionsAccessResourcesLibrary Advisory BoardFAQ
RESEARCH
JoVE JournalMethods CollectionsJoVE Encyclopedia of ExperimentsArchive
EDUCATION
JoVE CoreJoVE BusinessJoVE Science EducationJoVE Lab ManualFaculty Resource CenterFaculty Site
Terms & Conditions of Use
Privacy Policy
Policies

Related Concept Videos

Methods of Documentation III: PIE01:21

Methods of Documentation III: PIE

Problem-intervention-evaluation (PIE) is a systematic approach to documentation used in healthcare settings for clinical decision-making and patient care planning. It is a structured approach to organizing patient data based on problems, interventions, and evaluations. Here's a breakdown of its key features and considerations:
Design Example: Alignment of a Road Line Using GIS01:17

Design Example: Alignment of a Road Line Using GIS

The alignment of a road line using Geographic Information Systems (GIS) is a critical process in civil engineering, combining advanced technology with practical decision-making. This methodology begins with the collection of geospatial data, including information on land cover, geomorphology, drainage patterns, slope, and contour details. Such data is typically acquired through satellite imagery and GIS tools, offering a comprehensive understanding of the terrain.Once the data is gathered, it...

You might also read

Related Articles

Articles linked to this work by shared authors, journal, and citation graph.

Sort by
Same journal

Ensuring the health of hospital boilers.

Health estate·2018
Same journal

Solar PV - a bright future forecast.

Health estate·2018
Same journal

Removing the stigma, changing perceptions.

Health estate·2018
Same journal

Designing a tap to meet multiple criteria.

Health estate·2018
Same journal

Getting the sensory aspects right.

Health estate·2018
Same journal

Challenges set by the ErP Directive addressed.

Health estate·2018

Related Experiment Video

Updated: Jun 18, 2026

Implementation of Non-invasive Point of Care Transient Elastography for Evaluation of Liver Disease in Pediatric Populations with Cystic Fibrosis
05:56

Implementation of Non-invasive Point of Care Transient Elastography for Evaluation of Liver Disease in Pediatric Populations with Cystic Fibrosis

Published on: August 29, 2025

Off-site approach for Merseyside PFI.

Ken Dickinson1

  • 1NG Bailey.

Health Estate
|November 17, 2009
PubMed
Summary

Off-site construction of electrical and mechanical modules for new hospitals significantly improved the construction process. This approach reduced waste, site deliveries, and safety risks while enhancing quality.

Area of Science:

  • Construction Management
  • Building Services Engineering
  • Off-site Construction

Background:

  • The construction of new healthcare facilities presents complex logistical and safety challenges.
  • Integrating electrical and mechanical (M&E) services requires meticulous planning and execution.
  • Traditional on-site construction methods can lead to inefficiencies and increased risks.

Purpose of the Study:

  • To evaluate the benefits of utilizing off-site construction for M&E modules in hospital projects.
  • To assess the impact of off-site fabrication on project timelines, safety, waste, and quality.
  • To provide insights for optimizing M&E module construction in large-scale healthcare developments.

Main Methods:

  • Case study analysis of M&E module construction for St Helens and Whiston Hospitals.

More Related Videos

Involving Individuals with Developmental Language Disorder and Their Parents/Carers in Research Priority Setting
06:16

Involving Individuals with Developmental Language Disorder and Their Parents/Carers in Research Priority Setting

Published on: June 6, 2020

C-arm-Free Simultaneous OLIF51 and Percutaneous Pedicle Screw Fixation in a Single Lateral Position
12:25

C-arm-Free Simultaneous OLIF51 and Percutaneous Pedicle Screw Fixation in a Single Lateral Position

Published on: September 16, 2022

Related Experiment Videos

Last Updated: Jun 18, 2026

Implementation of Non-invasive Point of Care Transient Elastography for Evaluation of Liver Disease in Pediatric Populations with Cystic Fibrosis
05:56

Implementation of Non-invasive Point of Care Transient Elastography for Evaluation of Liver Disease in Pediatric Populations with Cystic Fibrosis

Published on: August 29, 2025

Involving Individuals with Developmental Language Disorder and Their Parents/Carers in Research Priority Setting
06:16

Involving Individuals with Developmental Language Disorder and Their Parents/Carers in Research Priority Setting

Published on: June 6, 2020

C-arm-Free Simultaneous OLIF51 and Percutaneous Pedicle Screw Fixation in a Single Lateral Position
12:25

C-arm-Free Simultaneous OLIF51 and Percutaneous Pedicle Screw Fixation in a Single Lateral Position

Published on: September 16, 2022

  • Description of the off-site fabrication process for electrical and mechanical services.
  • Qualitative assessment of project outcomes by the M&E contractor.
  • Main Results:

    • Off-site construction led to a higher proportion of M&E modules being prefabricated.
    • Significant reductions in safety risks, material waste, and the number of site deliveries were achieved.
    • Improved quality and consistency of electrical and mechanical fittings were observed.

    Conclusions:

    • Off-site construction of M&E modules offers substantial advantages for hospital projects.
    • This method enhances overall construction efficiency, safety, and quality.
    • Adoption of off-site strategies is recommended for future healthcare infrastructure development.