Objective:
The objective of this study was to investigate the sealing properties of 2 warm vertical compaction techniques (BeeFill 2in1, System B/Obtura II) in comparison with single-cone and cold laterally compacted gutta-percha.
Study Design:
The root canals of single-rooted human teeth were prepared by using Mtwo rotary files and divided into 4 groups (n = 10/group) with respect to the filling technique tested: Group 1, cold laterally compacted gutta-percha + AH-26; Group 2, single-cone tapered Mtwo gutta-percha + AH-26; Group 3, System B/ObturaII + AH-26; Group 4, BeeFill 2in1 + 2seal. The leakage of specimens was measured using a fluid-filtration method after 1 and 2 weeks. The data were analyzed statistically with 2-way repeated measures ANOVA (P = .05).
Results:
After 1 week, the System B/Obtura II group showed the greatest amount of leakage(P < .05) compared with the other test groups that had similar levels of fluid conductance(P < .05). By the end of the second week, the BeeFill group yielded the greatest amount of leakage (P < .05). Compared with their 1-week values, the fluid conductance of all test groups decreased significantly (P < .05).
Conclusion:
The apical sealing efficiency of System B/Obtura II and BeeFill were inferior to the other obturation techniques after 2-week fluid conductance testing in vitro.
Related Concept Videos
Vebe Test
To conduct the test, concrete is placed into the slump cone. The concrete is filled in layers and...
Placing Concrete
While placing concrete, care is taken to ensure that the concrete is laid in uniform layers, and hand shoveling and moving concrete using poker vibrators is avoided. Also,...
Compacting Factor test
The procedure begins by placing concrete into the upper hopper without any compaction. Once filled, the bottom door of this hopper is opened,...
Slump Test
Concrete is poured into the mold in three layers to conduct the test. Each layer is compacted 25 times with a steel tamping rod, which has a five-eighths-inch diameter and a rounded end, to ensure even distribution and eliminate...
Preplaced Aggregate Concrete
Cold Weather Concreting
To counteract the negative impacts of cold weather, ensuring...