Related Experiment Video
Updated: Jun 17, 2026

Preparation of Free-Surface Hyperbolic Water Vortices
Published on: July 28, 2023
Free water content and sludge retention time: impact on oxygen transfer in activated sludge
Jochen Henkel1, Peter Cornel, Martin Wagner
1Technische Universitat Darmstadt, IWAR, Wastewater Technology, Petersenstrabetae 13, 64287 Darmstadt, Germany. j.henkel@iwar.tu-darmstadt.de.
Abstract:
To investigate the effect of sludge retention time (SRT) and the concentration of mixed liquid volatile suspended solids (MLVSS) on oxygen transfer in activated sludge, we studied mass transfer coefficients (k(L)a) in a pilot-scale membrane bioreactor, which treated synthetic greywater. Additionally, experiments with iron hydroxide flocs were performed to examine the role of free water content in oxygen transfer. The results demonstrate that the alpha-factor is reduced when free water content decreases and floc volume increases. Because the MLVSS concentration in activated sludge mainly regulates floc volume, a reduction of oxygen transfer with increasing MLVSS concentration was observed. If the floc volume remains unchanged, oxygen transfer increases with increasing SRT.
More Related Videos
Related Concept Videos
Bioreactor Controls-II
Biological Treatment of Effluent and Waste Water
Microbial Wastewater Treatment
Porosity and Absorption of Aggregate
When all pores in an aggregate are filled with water, the aggregate is considered saturated and surface-dry. If left in dry air, water will evaporate until the aggregate...
Oxygen Transport in the Blood
Oxygen Requirements and Growth Patterns

