Related Experiment Video
Updated: Jun 17, 2026

Continuous Instream Monitoring of Nutrients and Sediment in Agricultural Watersheds
Published on: September 26, 2017
A comparison of total maximum daily load (TMDL) calculations in urban streams using near real-time and periodic
Michael B Henjum1, Raymond M Hozalski, Christine R Wennen
1Department of Civil Engineering, University of Minnesota, 500 Pillsbury Dr. SE, Minneapolis, MN 55455, USA.
Abstract:
A network of in situ sensors and nutrient analyzers was deployed to measure nitrate, specific conductance (surrogate for chloride), and turbidity (surrogate for total suspended solids (TSS)) for 28 days in two urban streams near Minneapolis, MN. The primary objectives of the study were: (1) to determine the accuracy associated with quantifying pollutant loading using periodic discrete (i.e., grab) samples in comparison to in situ near real-time monitoring and (2) to identify pollutant sources. Within a highly impervious drainage area (>35%) the majority of pollutant load (>90% for nitrate, chloride, and TSS) was observed to be discharged in a small percentage of time (<20%). Consequently, periodic sampling is prone to underestimate pollutant loads. Additionally, when compared to loads based on near real-time sampling, average errors of 19-200% were associated with sampling 1-2 times a month. There are also limitations of periodic sampling with respect to pollutant source determination. Resulting implications with regard to total maximum daily load (TMDL) assessments are discussed.
Related Concept Videos
Typical Model Studies
Design Example: Analyzing Capacity Contours for Flood Risk Assessment
Rapidly Varying Flow
Design Example: Creating a Hydraulic Model of a Dam Spillway

