Work through the valley: evaluate

Kenneth Wells1, Paul Koegel, Loretta Jones

  • 1Healthy African American Families II (HAAF), Los Angeles, CA 90008, USA.

Ethnicity & Disease
|January 21, 2010
PubMed

Related Concept Videos

Adjusting a Traverse01:12

Adjusting a Traverse

In the site survey of a four-sided traverse, internal angles are essential to ensure geometric accuracy. The survey revealed that the sum of the measured internal angles was 359 degrees and 48 minutes, which is 12 minutes less than the expected 360 degrees. This discrepancy signals an error likely arising from measurement inaccuracies during the fieldwork.To rectify this error, the adjustment process involved distributing the 12-minute shortfall equally across the four internal angles. By...
Vertical Curve: Problem Solving01:23

Vertical Curve: Problem Solving

Vertical curves provide the transition between two roadway grades, ensuring safety, comfort, and functionality. Calculating elevations at specific stations along the curve involves several systematic steps based on the curve's geometry and provided design parameters.The vertical curve is defined by its length, grades, Point of Vertical Intersection (P.V.I.) location, and P.V.I. elevation. The stations of the Point of Vertical Curvature (P.V.C.), where the curve begins, and the Point of Vertical...
Design Example: Maintaining Level of an Embankment01:19

Design Example: Maintaining Level of an Embankment

Constructing a roadway embankment over uneven terrain requires precise leveling to ensure stability and proper drainage. Surveyors use a leveling instrument and staff to calculate ground elevations and determine the required fill material at each point along the embankment alignment.The process begins by positioning a leveling instrument near a benchmark with a known elevation. A backsight reading establishes the instrument height, which serves as a reference for subsequent measurements. A...
Design Example: Analyzing Capacity Contours for Flood Risk Assessment01:17

Design Example: Analyzing Capacity Contours for Flood Risk Assessment

Flood risk assessment involves careful planning and analysis to ensure the safety of communities near water retention structures. Capacity contours are a vital tool in this process, as they illustrate the potential spread of water at specific levels in a given area. In the context of building a bund across a small valley, these contours play a critical role in evaluating the safety of nearby residential areas.In this example, the bund is intended to store stormwater in the valley. The engineers...
Self-Evaluation Maintenance Model01:29

Self-Evaluation Maintenance Model

The Self-Evaluation Maintenance (SEM) model offers a psychological framework to understand how individuals’ self-esteem is influenced by the achievements of others, particularly those with whom they share close personal bonds. The SEM model operates when personal rather than social identity guides individuals. Central to this model is the notion that individuals have an inherent desire to preserve a favorable self-image, which is continuously shaped by interpersonal comparisons and...
Hydraulic Jump: Problem Solving01:16

Hydraulic Jump: Problem Solving

To analyze a hydraulic jump in a rectangular channel with a flow speed of 6 meters per second, follow these steps:Calculate Effective Upstream Velocity:When the downstream gate closes, a hydraulic jump forms, traveling upstream at 2 meters per second. This wave speed combines with the initial channel flow velocity, creating an effective upstream velocity.Identify Flow Velocities Before and After the Hydraulic Jump:Upstream of the hydraulic jump, the effective flow velocity includes both the...